Planning Permission Ireland
Awaiting decisionEnergy

Crutt, Co. Kilkenny

Development of site access tracks and cabling in County Kilkenny as part of a larger 11-turbine wind farm.

16330 · Kilkenny County Council · Lodged 24 May 2016

Reference
16330
Authority
Kilkenny County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
24 May 2016

Summary

AI-generated

Permission is sought for 2 kilometres of site access tracks, underground cabling, and drainage works in Crutt, County Kilkenny. This forms part of a larger cross-county wind farm development with Laois, which will comprise 11 wind turbines up to 136.5 metres high, a substation, and a meteorological mast.

Energywind energyinfrastructurewind farm

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For development. The development will consist of: 2 kilometres of site access tracks; underground electricity and communications cabling; and site drainage works. The proposed development is part of a larger development which also extends onto lands in the townlands of knockardugar, boleybawn, garrintaggart, ironmills (kilrush) and graiguenahown, county laois within the adjoining planning authority administrative jurisdiction of laois county council. The proposed development as a whole will comprise 11 no. Wind turbines, each with a maximum height of up to 136.5 metres, and all associated site development and ancillary works, including a 110kv electricity substation, switchroom and equipment compound; two single circuit strain towers with a maximum height of up to 26.5 metres; turbine foundations; crane hardstandings; 7.4 kilometres of site access tracks; underground electricity and communications cabling; site drainage works; 7 no. Site entrances; a permanent meteorological mast with a maximum height of up to 85 metres; and temporary upgrade to the r430/l7800 road junction. This planning application is accompanied by an environmental impact statement which includes an assessment of the likely impacts of the proposed development as a whole and in combination with the relevant offsite or secondary developments which will occur as a direct result of the proposed development, including connection to the national electricity grid. A natura impact statement will also be submitted to the planning authority with the planning application

Key dates

Timeline

  1. Application received24 May 2016

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.