Awaiting decisionEnergy

in the townslands of Killeen, Foylatalure and Courtstown, Tullaroan

Construction of one wind turbine and associated electrical connection.

167 · Kilkenny County Council · Lodged 8 January 2016

Reference
167
Authority
Kilkenny County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
8 January 2016

Summary

AI-generated

The application seeks permission for one wind turbine with a hub height up to 80m and blade tip height up to 121m. It includes underground cabling and a 5.275km electrical connection to link with an adjacent permitted wind farm and substation.

Energywind energyturbineinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For one wind turbine with a hub height up to 80m and a maximum blade tip height up to 121m, underground cabling, together with associated access road (337m) and site works. The proposed turbine will form part of a permitted wind farm (pl. Ref. 12/378 as amended by pl 13/9) on the adjacent foylatalure and courtstown site and will utilise/share the constructed access roads, borrow pit and permitted control building. The development also proposes a 20kv electrical connection between the permitted adjacent foylatalure wind farm (pl. Ref. 12/378 as amended by pl 13/9) and permitted 38 kv sub-station at ballybeagh, co. Kilkenny (pl. Ref 12/485). The 20kv electrical connection (c. 5.275km long) will consist of: c. 2.293km of overhead 20kv line mounted on single pole sets and c. 2.982 km of underground ducted 20kv cable in the townlands of courtstown, rathmacan, kyleballyoughter, gortnagap and ballybeagh. An appropriate period of 10 years (. Ie. Duration of the planning permission to construct the development) is sought, with an operational life of 25 years after the date of commissioning. An environmental impact statement (eis) and natura impact statement (nis) accompany this application

Key dates

Timeline

  1. Application received8 January 2016

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.