Awaiting decisionIndustrialDecision due in 7 days (30 July 2026)

Kilree Sheastown, Bennettsbridge, Co. Kilkenny

Continued rock extraction and a 4.5-hectare lateral extension of a quarry in Bennettsbridge.

2560532 · Kilkenny County Council · Lodged 18 August 2025

Reference
2560532
Authority
Kilkenny County Council
Register status
In progress
Type
PERMISSION
Received
18 August 2025

Summary

AI-generated

Planning permission is sought for a development across a 61-hectare site to continue rock extraction and blasting beyond the current expiry date. The application also includes the continued use of existing quarry infrastructure and a lateral extension of the limestone quarry by approximately 4.5 hectares.

Industrialquarryextractionextensionblasting

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For the proposed development will take place within an overall application area of approximately 61 hectares and will consist of the following
  • The continued extraction of rock? —? Including periodic blasting to fragment the rock prior to excavation? —? From the existing permitted quarry area (plan file ref. No.? 18/858) beyond the current permission expiry date
  • The continued use of existing quarry infrastructure (including crushing, screening and lime processing plant), existing pre-cast manufacturing facility (including associated ancillary works for manufacturing of concrete products), batching of lime products, workshop, canteen, toilet facilities, weighbridges, wheelwash, fuel stor-age area and switch room, settlement lagoons, haul roads, esb substation, plant and product storage areas and all other ancillary facilities as permitted under plan file ref. No. 18/858
  • The continued use of site offices authorised under plan file ref. No. 20/891
  • A lateral extension of the existing limestone quarry, within an area of approx. 4.5 ha. , comprising: - approximately 18.2 hectares of extraction, including blasting, over 2 no. C 19 metre high benches to a final floor level ranging from 25 to 30m od; and - overburden storage areas and landscaped screening berms (6.3 ha)
  • To access the extension lands rock will be extracted - including by controlled blasting - from under: - approx. 1.4 hectare of land that is currently under landscaping measures authorised under plan file ref. No. 18/858; - approx. 2.1 hectare of land that is currently in use as an access ramp authorised under plan file ref. No. 18/858
  • The removal of topsoil and overburden, construction of landscaped screening berms, and provision of an overburden storage area
  • Demolition of an existing farmyard and associated buildings and structures, permitted under plan file ref. No. 15/595, and removal of approximately 6.81 hectares of commercial forestry within the proposed extension area to allow for the proposed quarry development
  • All associated ancillary site facilities/works, including surface water management, internal haul roads, phased restoration, and landscaping. The applicant is seeking a 25-year permission for extraction and associated activities, with an additional 2 years for final site restoration. The planning application will be accompanied by an environmental impact assessment report (eiar)

Key dates

Timeline

  1. Application received18 August 2025
  2. Further information requested10 October 2025
  3. Further information received9 March 2026
  4. Decision due30 July 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.