Planning Permission Ireland
Awaiting decisionInfrastructure

IN THE WEATHERLOCK FIELD, WITHIN THE CURTILAGE OF THE BIRR CASTLE DEMESNE, BIRR

Amendments to a previously approved radio telescope development and barn renovation at Birr Castle Demesne.

16210 · Offaly County Council · Lodged 27 June 2016

Reference
16210
Authority
Offaly County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
27 June 2016

Summary

AI-generated

The project involves amendments to a previously granted permission for a Low Frequency Array (LOFAR) radio telescope. It includes the renovation and extension of Mount Palmer Barn, change of use of parts of the barn, upgrading of roads, and retention of a telescope control room within a protected demesne area.

Infrastructuretelescopeheritagescientific

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Amendments to previously granted permission (ref. No: br/13007 granted 10/09/2013). The development consists of the construction of a low frequency array (lofar) radio telescope comprising two low-lying 74m diameter circular landscape array installations with 2.9m high 15m2 control unit; the renovation and extension of the mount palmer barn (138m2) to include a 27m2 timber-glazed single-storey lean to loggia extension on the southeast elevation and the change of use of 114m2 of the barn to telescope interpretation facility use; septic tank installation site landscaping and sundry other works. The development for retention consisting of the change of use of the existing 24m2 room at the north end of the barn to telescope control room use. Additional amendments include the upgrading of the old graveyard road to access a new borrow pit to the east of the site within the demense protected area, upgrading of drainage surrounding the weatherlock field, construction of assembly areas to the north of the array, additional access pathways, construction of a berm and drainage channel surrounding the low frequency array approximately 1.2m above the existing ground level, raising the finished level of the highbeam array to a maximum of 42.5od, construction of manholes and additional drainage, installation of power and fibre cabling

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
26 High St, Birr, OffalyMay 2025€95,000419 m
14 Castle Court, Birrprice excludes VATJan 2010€110,132434 m
23 High St, Birr, OffalyJan 2025€145,000443 m
11 Castle Court, Birrprice excludes VATJan 2010€110,132449 m
12 Castle Court, Birrprice excludes VATJan 2010€110,132452 m
4 Castle Court, Birrprice excludes VATJan 2010€154,185453 m
Property B, Castle St, BirrAug 2025€109,650459 m
Property A, Castle Street, BirrAug 2025€100,000459 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 June 2016

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.