BALLYDUFF TOWNLAND, TULLAMORE, CO. OFFALY
A 10-year permission for a solar farm on a 17.7-hectare site.
1711 · Offaly County Council · Lodged 16 January 2017
- Reference
- 1711
- Authority
- Offaly County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 16 January 2017
Summary
AI-generatedThe development consists of a solar farm comprising ground-mounted photovoltaic panels on a 17.7-hectare site. It includes an ESB terminal station, a switchgear enclosure, storage containers, inverter stations, perimeter fencing, CCTV, and internal access tracks.
- Storey
- 1
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
A 10 year permission (to construct development). The development will consist of a solar farm comprising: the installation of photovoltaic panels on ground mounted frames in rows on a site of c. 17.7 hectares, a single storey esb terminal station, a single storey switchgear enclosure as well as 2 no. Single storey storage containers, 8 no. Single storey inverter stations, ducting and underground electrical cabling, perimeter fencing, 10 no. Mounted cctv cameras, use of existing access from the r420 and provision of internal access tracks, and all associated site development (including minor re-profiling to existing levels of c. 0.5 hectares), and landscaping works
Key dates
Timeline
- Application received16 January 2017
- Further information requested10 March 2017
- Further information received3 July 2017
- Decision due30 July 2017
- Decision issued28 July 2017
- Grant issued31 August 2017
- Permission expiry30 August 2027
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
THE EXTENSION OF THE OPERATIONAL LIFESPAN OF A SOLAR FARM PERMITTED BY OFFALY COUNTY COUNCIL UNDER REG. REF.…
BALLYDUFF , TULLAMORE , CO. OFFALY
23316OffalyLodged 30 Jun 2023Energy
- Awaiting decision130 m away
Permission for retention of changes to an existing vehicular entrance off the R420 to facilitate the…
Ballyduff (Townland) , Tullamore , Co. Offaly
2560295OffalyLodged 9 Jul 2025Retention
- Granted130 m away
Changes to an existing vehicular entrance off the R420 to facilitate the construction of the Solar PV Farm…
Ballyduff (Townland) , Tullamore , Co. Offaly
2560334OffalyLodged 29 Jul 2025Energy
- Granted320 m away
THE REPLACEMENT OF A PERMITTED SINGLE STOREY TERMINAL ELECTRICAL STATION AND SEPARATE PERMITTED SWITCHGEAR…
TOWNLAND OF BALLYDUFF , TULLAMORE , CO. OFFALY
23315OffalyLodged 30 Jun 2023Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedEnergy
A 10 YEAR PERMISSION (TO CONSTRUCT DEVELOPMENT) FOR A SOLAR FARM COMPRISING THE INSTALLATION OF PHOTOVOLTAIC…
TOWNLANDS OF GORMAGH AND CULLEEN , TULLAMORE , CO. OFFALY
22387OffalyLodged 3 Aug 2022
- Awaiting decisionEnergy
(PLANNING REFERENCE PL2/17/275) FOR DEVELOPMENT AT THIS SITE. THE DEVELOPMENT WILL CONSIST OF SOLAR…
THE TOWNLANDS OF SHANDERRY AND KILMALOGUE , PORTARLINGTON , CO. OFFALY
23171OffalyLodged 19 Apr 2023
- GrantedEnergy
A 10 year permission for the construction of a Solar Farm PV Energy Development comprising installation of…
Clonfad Enniscoffey or Caran , Hightown or Ballyoughter Lowtown or Balleighter , Pass of Kilbride and Rattin
196168WestmeathLodged 25 Jun 2019
- Awaiting decisionEnergy
The application is for a 10 year permission (to construct development). The development will consist of a…
Knightsbrook and Commons (7th Divison) , Trim , Co. Meath
TA170317MeathLodged 27 Mar 2017
- RefusedEnergy
PLANNING PERMISSION WITH A DURATION OF 10 YEARS FOR A SOLAR PV FARM WITH AN OPERATIONAL LIFESPAN OF 35 YEARS…
TULLAMORE DROMBEG , AND COOLKERAGH LISTOWEL , CO. KERRY
18720KerryLodged 18 Jul 2018
- GrantedEnergy
FOR DEVELOPMENT CONSISTING OF A 10 YEARS PERMISSION FOR A SOLAR FARM WITHIN A SITE AREA OF 10.19 HECTARES…
KNOCKREAGH , MILLTOWN , KILLARNEY
171305KerryLodged 22 Dec 2017
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.