Planning Permission Ireland
GrantedIndustrialDecided 29 July 2019

ROSCREA ROAD, BIRR, CO. OFFALY

Construction of a steel-framed light industrial warehouse in Birr.

19268 · Offaly County Council · Lodged 5 June 2019

Reference
19268
Authority
Offaly County Council
Register status
Decided
Type
PERMISSION
Received
5 June 2019

Summary

AI-generated

The project involves building a single-storey, cladded steel portal frame light industrial warehouse to the rear of an existing facility. The building will have a floor area of approximately 406 square metres and a ridge height of 8.6 metres.

Industrialwarehouseindustrial
Storey
1
Floor area
406 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The construction of a single storey cladded structural steel portal frame light industrial warehouse and all associated enabling and site works to complete the project to the rear of the existing light industrial facility. The proposed structure will have an eaves and ridge height of approx. 7.050m and 8.600m respectively. The floor area of the building will be approx. 406sq metres. The building will have two number mechanically operated roller shutter doors and one number pedestrian access door to its north eastern elevation. One pedestrian door will be located on the sourthern elevation. The proposed cladded portal framed building will have reinforced concrete wall to its perimeter of a height of approx. 2.4m. The remainder of the building and roof will be clad with a lightweight insulated composite panel

Land-use zoning

What this land is zoned for

Enterprise and EmploymentCOE
This zoning promotes the development of employment uses that reinforce the enterprise and employment function of the subject area as a whole and require high environmental and design standards.

National zoning type: Office, business/technology park and related

Objective set by the Birr Local Area Plan 2023-2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 30 October 2019.

Notified floor area: 406

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 Highgate, Drumbane, BirrMay 2025€250,000434 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 June 2019
  2. Decision due30 July 2019
  3. Decision issued29 July 2019
  4. Grant issued2 September 2019
  5. Permission expiry1 September 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.