TRASCAN & CLONDOOLUSK, COUNTY OFFALY
A large-scale solar farm on approximately 86.7 hectares in County Offaly.
19589 · Offaly County Council · Lodged 11 December 2019
- Reference
- 19589
- Authority
- Offaly County Council
- Register status
- Withdrawn
- Type
- PERMISSION
- Received
- 11 December 2019
Summary
AI-generatedThe proposed 10-year permission is for a solar farm operating for 40 years, featuring ground-mounted solar panels, 40 inverter stations, and security infrastructure. A Natura Impact Statement has been submitted, and a separate application for a 110kV substation will be made to An Bord Pleanála.
- Storey
- 1
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
A solar farm on a total site area of approximately 86.7 hectares (ha), consisting of photovoltaic panels on ground mounted steel frames with associated cabling and ducting; 40 no. Single storey inverter stations; 4 no. Steel storage containers; perimeter fencing; security gates; permeable gravel access track; 36 no. Onsite pole mounted cctv cameras c. 3m in height; 2 no. Temporary construction compound/material storage area; 2 no. Temporary construction stage moby dick type wheelwash systems (with overhead settlement tank); and all associated ancillary development services and works. Permission is sought for the proposed solar farm for a period of 10 years with an operational period of 40 years. A natura impact statement (nis) is submitted with the planning application. An application to obtain permission for the development of transmission infrastructure which consists of a 110 kilovolt (kv) substation and associated grid connection to facilitate the export of power from the solar farm will be submitted to an bord pleanala
Built & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| Treason, Portarlington, Co Offaly | Mar 2025 | €295,000 | 294 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received11 December 2019
- Further information requested12 February 2020
- Further information received17 September 2020
- Application withdrawn11 February 2021
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
THE DEVELOPMENT OF A SOLAR FARM ON A TOTAL SITE AREA OF 86.7 HECTARES (HA), CONSISTING OF PHOTOVOLTAIC PANELS…
TRASCAN AND CLONDOOLUSK , CO. OFFALY
21123OffalyLodged 11 Mar 2021Energy
- Awaiting decisionAt this site
DEVELOPMENT CONSISTING OF A SOLAR FARM ON A TOTAL SITE AREA OF 88 HECTARES (HA), CONSISTING OF PHOTOVOLTAIC…
TRASCAN AND CLONDOOLUSK , CO OFFALY
19430OffalyLodged 4 Sept 2019Energy
- Awaiting decisionAt this site
SOLAR FARM ON A TOTAL SITE AREA OF APPROXIMATELY 86.7 HECTARES (HA), CONSISTING OF PHOTOVOLTAIC PANELS ON…
TRASCAN AND CLONDOOLUSK , CO OFFALY
19566OffalyLodged 27 Nov 2019Energy
- Granted120 m away
A STOREY & HALF TYPE DWELLING WITH EFFLUENT TREATMENT SYSTEM & PERCOLATION AREA WITH NEW VEHICULAR ENTRANCE…
CLONDOOLUSK , PORTARLINGTON , CO. OFFALY
22594OffalyLodged 16 Nov 2022New dwelling
- Granted190 m away
ALTERATIONS TO PREVIOUS PLANNING PERMISSION REFERENCE PL2/10/13; CONSISTING OF ALTERATIONS TO THE HOUSE…
CLONDOOLUSK , PORTARLINGTON , CO. OFFALY
16128OffalyLodged 4 May 2016Alterations
- Awaiting decision190 m away
ALTERATIONS TO PREVIOUS PLANNING PERMISSION REFERENCE PL2/10/13 (FOR DWELLING HOUSE, DOMESTIC GARAGE AND…
CLONDOOLUSK , PORTARLINGTON , CO. OFFALY
16115OffalyLodged 22 Apr 2016Alterations
- Granted340 m away
EXISTING DWELLING AS CONSTRUCTED, A SINGLE STOREY HOME STUDIO AND ALL ASSOCIATED SITE WORKS
TREASCON , PORTARLINGTON , CO. OFFALY
21311OffalyLodged 19 May 2021Retention
- Granted380 m away
Extension to existing dwelling, construction of dormer windows to front elevation and conversion of attic…
Treascon , Portarlington , Co Offaly
2460203OffalyLodged 4 Jun 2024Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionEnergy
SOLAR FARM ON A TOTAL SITE AREA OF APPROXIMATELY 86.7 HECTARES (HA), CONSISTING OF PHOTOVOLTAIC PANELS ON…
TRASCAN AND CLONDOOLUSK , CO OFFALY
19566OffalyLodged 27 Nov 2019
- Awaiting decisionEnergy
DEVELOPMENT CONSISTING OF A SOLAR FARM ON A TOTAL SITE AREA OF 88 HECTARES (HA), CONSISTING OF PHOTOVOLTAIC…
TRASCAN AND CLONDOOLUSK , CO OFFALY
19430OffalyLodged 4 Sept 2019
- GrantedEnergy
DEVELOPMENT OF A SOLAR FARM CONSISTING OF SOLAR PV PANELS MOUNTED ON STEEL SUPPORTED STRUCTURES WITH…
TOWNLANDS OF TRASCAN AND CLONDOOLUSK , CO. OFFALY
22390OffalyLodged 5 Aug 2022
- GrantedEnergy
THE DEVELOPMENT OF A SOLAR FARM ON A TOTAL SITE AREA OF 86.7 HECTARES (HA), CONSISTING OF PHOTOVOLTAIC PANELS…
TRASCAN AND CLONDOOLUSK , CO. OFFALY
21123OffalyLodged 11 Mar 2021
- RefusedEnergy
PLANNING PERMISSION WITH A DURATION OF 10 YEARS FOR A SOLAR PV FARM WITH AN OPERATIONAL LIFESPAN OF 35 YEARS…
TULLAMORE DROMBEG , AND COOLKERAGH LISTOWEL , CO. KERRY
18720KerryLodged 18 Jul 2018
- Awaiting decisionEnergy
A PERIOD OF 10 YEARS TO CONSTRUCT AND COMPLETE A SOLAR PV ENERGY DEVELOPMENT WITH A TOTAL SITE AREA OF 73.9…
THE TOWNLANDS OF BALLYTEIGE LITTLE AND DERRYGROGAN BIG , TULLAMORE , CO. OFFALY
22352OffalyLodged 15 Jul 2022
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.