Planning Permission Ireland
RefusedHousing estateDecided 28 October 2021

ARDAN ROAD ARDAN, TULLAMORE, CO. OFFALY

Construction of 60 homes, including 12 apartments and 48 houses, with associated infrastructure.

21462 · Offaly County Council · Lodged 26 July 2021

Reference
21462
Authority
Offaly County Council
Register status
Decided
Type
PERMISSION
Received
26 July 2021
Residential units
48
Floor area
5269.95 m²

Summary

AI-generated

This application seeks permission for a residential development of 60 two-storey dwellings. The scheme comprises 12 one-bedroom apartments, 16 two-bedroom terrace houses, 1 three-bedroom detached house, 28 three-bedroom semi-detached houses, 2 four-bedroom semi-detached houses, and 1 five-bedroom detached house. The project includes solar panel options, public open space, an ESB substation, a pumping station, and a new distributor road.

Housing estatehousing estateapartmentssolarinfrastructure
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(1) the construction of 60 no. Two-storey dwellings comprising of; 12 no. One-bedroom apartments (types a1, a2), 16 no. Two-bedroom terrace houses (types b1 , b3, b4), 1 no. Three-bedroom detached house (type d1), 28 no. Three-bedroom semi-detached houses (types e, f1, f2), 2 no. Four-bedroom semi-detached houses (types g, h1), 1 no. Five-bedroom detached house (type j2), with each dwelling to include option for solar panel on roof slope; (2) provision of private amenity space and 2 no. Curtilage car parking spaces for each dwelling; (3) landscaped public open space; (4) associated boundary treatments; (5) public lighting layout; (6) esb unit substation & pumping station; (7) distributor road from the existing roundabout and spur road at ardan road (r421) and distributor road to the southern boundary of the application site and associated surface water drainage connection via a wayleave to the existing surface water network adjacent to the roundabout at ardan road; (8) surface water connection to the existing watercourse south of the development; (9) wastewater connection to the existing wastewater sewer at ardan road (r421) to the west of the development; (10) water supply connection via a wayleave to the existing water network adjacent to the roundabout at ardan road (r421 ); (11) suds drainage and all associated site development works necessary to facilitate the development

Land-use zoning

What this land is zoned for

Business/Technology ParkSI
This zoning facilitates opportunities for technology based industry and advanced manufacturing, compatible office space and research and development based employment within high quality, highly accessible, campus style settings.

National zoning type: Industrial, enterprise, employment

Objective set by the Offaly County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Teach Siochain, Arden Rd, TullamoreAug 2025€200,000228 m
9 The Green, The Hawthorns, Arden Roadnot full market priceMay 2025€260,000297 m
The Bungalow, Arden Rd, TullamoreFeb 2026€325,000396 m
8 Eiscir Island, Eiscir Meadows, TullamoreJan 2026€309,000403 m
Arden Lane, Tullamore, County OffalyMay 2025€335,000411 m
Arden Lane, Tullamore, County OffalyMar 2026€410,000411 m
29 Ridley Way, Tullamoreprice excludes VATMay 2026€356,828417 m
49 Eiscir Island, Eiscir Meadows, TullamoreJul 2025€295,000455 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 July 2021
  2. Further information requested17 September 2021
  3. Further information received1 October 2021
  4. Decision due28 October 2021
  5. Decision issued28 October 2021
  6. Appeal submitted24 November 2021
  7. Appeal decided19 September 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.