GrantedIndustrialDecided 7 November 2023

DERRYARKIN, RHODE, CO. OFFALY

Demolition of farm sheds and construction of a materials recovery facility to process up to 90,000 tonnes of waste per year.

22490 · Offaly County Council · Lodged 21 September 2022

Reference
22490
Authority
Offaly County Council
Register status
Decided
Type
PERMISSION
Received
21 September 2022

Summary

AI-generated

The project involves the demolition of 1,417 square metres of agricultural sheds. In their place, a materials recovery facility will be built to process household, commercial, and construction waste, featuring a two-storey administration building, a single-storey processing building, and external storage bays.

Industrialwaste managementdemolitionindustrial
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the demolition of existing agricultural sheds and structures on-site and the construction and operation of a materials recovery facility for the acceptance and processing of up to 90,000 tonnes per annum of household, commercial and industrial (c&i), and construction and demolition (c&d) waste. Elements of the proposed development include the following. (1) the demolition of all existing site agricultural sheds and structures on-site (which cover an area of 1,417 m2). (2) the construction and operation of a materials recovery facility, comprising: (a) a site entrance, (b) a weighbridge, (c)trucking set down and parking areas, (d) staff parking, comprising 24 parking spaces including disabled parking and ev charging, (e) a concrete yard area, (f) a fuel storage area, (g) external waste storage bays, (h) skip / bin storage areas, (i) a perimeter boundary wall (4 m in height) and perimeter fencing (2.1 m in height), (j) a stormwater drainage and attenuation system, (k) an administration two-storey building (with an overall floor area of c. 396m2 and c. 7.35m in height), (l) a single storey materials recovery facility (with an overall floor area of c. 2,850m2 to a maximum height of c. 13m), (m) a truck loading bay, (n) an on-site wastewater treatment system, associated percolation area and ancillary services, (o) an on-site esb sub-station and adjoining electrical room (with a combined floor area of 61 m2 and 2.175 m in height), (p) solar panels (covering a total area of 737 m2) mounted atop the proposed administration and materials recovery facility buildings. The application is accompanied by an environmental impact assessment report (eiar) and natura impact statement (nis). The proposed development will accept up to 50,000 tonnes of waste per annum and operate under a waste facility permit from offaly county council during phase 1 of operations. The proposed development will accept up to 90,000 tonnes of waste per annum and operate under an industrial emissions licence from the environmental protection agency during phase 2 of operations

Key dates

Timeline

  1. Application received21 September 2022
  2. Further information requested15 November 2022
  3. Decision due7 November 2023
  4. Decision issued7 November 2023
  5. Appeal submitted30 November 2023
  6. Appeal decided19 September 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.