Planning Permission Ireland
GrantedRetentionDecided 13 December 2024

PORTARLINGTON INDUSTRIAL ESTATE, KILMALOGUE, PORTARLINGTON

Retention of CO2 vessels, office space, and modifications at an industrial estate in Portarlington.

24154 · Offaly County Council · Lodged 21 October 2024

Reference
24154
Authority
Offaly County Council
Register status
Decided
Type
RETENTION
Received
21 October 2024

Summary

AI-generated

Retention is sought for three CO2 vessels, a single-storey production office, window openings, and parking areas at an existing factory. Permission is also sought for a new maintenance shed, additional windows, and a sliding electric gate.

Retentionindustrialretention

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

2 no. 16 metre high and 1 no. 14.5 metre high co2 vessels to the east, a single storey production office to the south, the opening of ground and first floor windows, an entrance and two roller shutter doors to the west of the existing factory building. Additional parking areas to the west. Internally a ground floor w. C. Entrance lobby with canteen and first floor office, meeting room and storage area. Permission for the proposed development will consist of a maintenance shed to the west, first floor windows to the north of the existing factory building and installation of a sliding electric gate to the east including all internal modifications and associated site works

Land-use zoning

What this land is zoned for

IndustryBP
The use of land for Industry

National zoning type: Mixed/general commercial/industrial/enterprise uses

Objective set by the LAOIS COUNTY DEVELOPMENT PLAN 2021-2027 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
33 Botley Court, Portarlington, Co OffalyApr 2025€300,000237 m
9 Botley Court, Botley Lane, PortarlingtonMar 2026€270,000245 m
17 Botley Court, Portarlington, LaoisMay 2025€267,000271 m
Patrick St, Portarlington, OffalyJul 2025€465,000378 m
Patrick Street, Portarlington, County OffalyMay 2025€256,500438 m
4 Spire View, Patrick Street, PortarlingtonSept 2025€280,000494 m
8 Rose Court, Portarlington, LaoisJun 2025€295,000500 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 October 2024
  2. Decision due15 December 2024
  3. Decision issued13 December 2024
  4. Grant issued27 January 2025
  5. Permission expiry26 January 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.