Planning Permission Ireland
GrantedHousing estateDecided 21 November 2017

Drummin, Nenagh, Co. Tipperary.

Extension of duration for a large development of 246 dwellings, two retail units, and two creches in Nenagh.

17601072 · Tipperary County Council · Lodged 28 September 2017

Reference
17601072
Authority
Tipperary County Council
Register status
Decided
Type
EXTENSION OF DURATION
Received
28 September 2017

Summary

AI-generated

This application seeks to extend the duration of permission for a major development. The scheme includes 244 houses and apartments, a building with two retail units and two apartments, and two double-storey creches.

Housing estatehousing estatecrecheretail
Residential units
246

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

246 dwellings, 2 no. Retail units and 2 no. Creches as follows: (a) 244 dwellings consisting 64 3-storey semi-detached houses (top floor in attic space), 64 2-storey semi-detached houses, 8 terraced houses in 2 no. 2-storey terraces of 4 houses, 30 apartments in 3 no. 3/4 storey blocks each of which contain 10 no. Apts, 21 3-storey detached houses (top floor in attic space), 57 2-storey detached houses, (b) a building containing 2 no. Retail units on the ground floor and 2 no. Apts. On the 1st floor (c) 2 no. 2-storey creches and including all site works with access from drummin road (permission 06520083) under clause a 42 (1a)(a)(v)

Land-use zoning

What this land is zoned for

New ResidentialR1
To provide for new residential development

National zoning type: New/proposed residential

Objective set by the Nenagh Local Area Plan 2024-2030 (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 16 December 2019.

Notified floor area: 124

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
18 The Mall, Drummin Village, Nenaghprice excludes VATFeb 2025€308,370244 m
9 The Mall, Drummin Village, Nenaghprice excludes VATApr 2025€325,992244 m
6 The Mall, Drummin Village, Nenaghprice excludes VATJul 2025€286,344244 m
4 The Mall, Drummin Village, Nenaghprice excludes VATAug 2025€286,343244 m
20 The Mall, Drummin Village, Nenaghprice excludes VATMar 2025€330,000244 m
62 The Close, Drummin Village, NenaghJun 2026€343,000349 m
34 The Close, Drummin Village, NenaghJan 2026€255,000366 m
55 The Close, Drummin Village, NenaghApr 2025€305,000367 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received28 September 2017
  2. Decision due22 November 2017
  3. Decision issued21 November 2017
  4. Permission expiry31 December 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.