Moanvaun, Glengar, Hollyford
Extension of duration for a 107-metre-tall wind turbine in Hollyford.
17601085 · Tipperary County Council · Lodged 28 September 2017
- Reference
- 17601085
- Authority
- Tipperary County Council
- Register status
- Decided
- Type
- EXTENSION OF DURATION
- Received
- 28 September 2017
Summary
AI-generatedThis application seeks to extend the duration of permission for a single wind turbine with a 67-metre hub height and a 107-metre blade tip height. The project includes a transformer, hardstand, and access track.
- Residential unit
- 1
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Construction of 1 no. Wind turbine with steel tower and composite fibre rotor blades of 67 metres hub height , blade radius of 40 meteres/80 meters diameter, with overall blade tip height of 107 meteres(relating to the same site as previously applied for planning ref 06/1452) and including wind turbine transformer, turbine hardstand, access track, under-grounded electrical cables, underground communication cable and all associated site works and ancillary development
Key dates
Timeline
- Application received28 September 2017
- Decision due22 November 2017
- Decision issued17 November 2017
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decision150 m away
Development consisting of the installation of battery arrays, located within container units (19 number…
Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford
19601283TipperaryLodged 18 Nov 2019Energy
- Awaiting decision190 m away
Development consisting of the installation of battery arrays, located within container units (19 number…
Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford
19601309TipperaryLodged 25 Nov 2019Energy
- Granted220 m away
Development consisting of the installation of battery arrays, located within container units (18 number…
Garracummer Wind Farm , Kilcommon Cross , Moanvaun Hollyford
2018TipperaryLodged 14 Jan 2020Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
To erect a single electricity generating wind turbine of hub height up to 60m and rotor diameter up to 48m, a…
Clooncon East ,
19147galwayLodged 1 Feb 2019
- Awaiting decisionEnergy
Erection of a single electricity generating wind turbine of hub height up to 60m and rotor diameter up to…
Knockavaddra, Bweeng, ,
126396corkLodged 22 Nov 2012
- Awaiting decisionEnergy
Development consisting of the erection of an electricity generating wind turbine with hub height of 80 metres…
Greaghlatacapple , Corduff , Carrickmacross
233MonaghanLodged 4 Jan 2023
- Awaiting decisionEnergy
Construction of one wind turbine generator (with a maximum hub height of up to 76 metres, a maximum rotor…
Moneygorm, Glenville, Co. Cork,
116017corkLodged 20 Sept 2011
- GrantedEnergy
Completion of erection of 1 no. wind turbine of 80m hub height and 90m diameter rotor blade, on site tracks,…
Coumaclovane, Coolea, .,
116225corkLodged 18 Oct 2011
- GrantedEnergy
Erection of a wind turbine with hub height of up to 100m, rotor radius of up to 50.5m and overall height from…
DePuy Synthes, Loughbeg, Ringaskiddy, Co. Cork
156967corkLodged 23 Dec 2015
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.