Planning Permission Ireland
GrantedCommercialDecided 6 February 2018

Noard, Newhill, Leigh & Borris

Extension of duration for a massive mixed-use leisure campus including a 500-bedroom hotel, venue, and racecourse.

17601350 · Tipperary County Council · Lodged 8 December 2017

Reference
17601350
Authority
Tipperary County Council
Register status
Decided
Type
EXTENSION OF DURATION
Received
8 December 2017

Summary

AI-generated

This application seeks to extend the duration of permission for 'The Tipperary Venue'. The massive development includes the demolition of several buildings and the construction of a 500-bedroom hotel, a 15,000-capacity venue, an equestrian centre, a heliport, an 18-hole golf course, a racecourse, and retail units.

Commercialhotelstadiumgolf courseleisure
Floor area
161,374 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The tipperary venue -mixed use leisure campus comprising: a) demolition of all existing buildings on site comprising 5no. Dwelling houses; 1no. Derelict dwelling house; 1no. Commercial warehouse/storage build; agric. Outbuildings. Total gfa of buildings to be demolished is 2,872sq. M. B) construction of: i) 500 bedroom hotel build. (80,577sq. M. ) ii) 15,000 person capacity venue build. (23,362sq. M. -to accommodate sports, concerts & other events. Iii) equestrian centre (5,872sq. M. ) iv) heliport (2,383sq. M. ) v) 18 hole golfcourse & ancillary golf club build. (3,462sq. M. ) vi) driving range & ancillary build. (484sq. M. ) vii) chapel (255sq. M. ) viii) 31no. Retail units (2,883sq. M. ) ix) hoban memorial build. (1,984sq. M. ) to accommodate banqueting suite & museum with reproduction lafayette park & subterranean link to proposed hotel build. X) grade 1 race course (c. 23.5ha) & greyhound track (c. 0.36ha) with shared ancillary builds. (40,358sq. M. ) xi) single storey energy centre build. (1,530sq. M. ) xii) treatment plant (252sq. M. ) c) provision of all associated landscaping, boundary treatment & site developement works includ. : i) diversion of existing site services. Ii) revised surface water drainage regime includ. Diversion & culverting of parts of derheen & clover rivers. Relocation of an attenuation pond adjacent to the two mile borris interchange. Iii) drilling for a potable water supply (on site) to serve proposed development. Iv) provision of 5743no. Car parking spaces; 136 bus parking spaces; 72no. Greyhound box spaces; 100 horse box spaces. V) provision of new 4-arm roundabout on r639 to serve proposed develop. Provision of emergency only access rd. With priority junction onto r639. Vi) link rd. To connect r639 (via new 3-arm roundabout) to recently constructed two mile borris grade separated junction on m8 & construct 2no. Slip lanes to complete the diamond interchange. Widening of approaches to roundabouts at two mile borris interchange to allow two way flow. Segregated left turn lane (on existing southbound diverge) to allow traffic to join proposed lind rd in a free flow manner. Termination of existing accommod. Rd (on sth. Side of new link rd) & new access onto northern side of link rd. For exist. Accomm. Rd. Total gfa of entire develop. 163,091sq. M. The planning application is accompanied by an environmental impact statement (eis). A waste licence will be required in respect of this development. (previous ref. 09/51/0624)

Key dates

Timeline

  1. Application received8 December 2017
  2. Decision due10 February 2018
  3. Decision issued6 February 2018
  4. Permission expiry22 March 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.