Noard, Newhill, Leigh & Borris
Extension of duration for a massive mixed-use leisure campus including a 500-bedroom hotel, venue, and racecourse.
17601350 · Tipperary County Council · Lodged 8 December 2017
- Reference
- 17601350
- Authority
- Tipperary County Council
- Register status
- Decided
- Type
- EXTENSION OF DURATION
- Received
- 8 December 2017
Summary
AI-generatedThis application seeks to extend the duration of permission for 'The Tipperary Venue'. The massive development includes the demolition of several buildings and the construction of a 500-bedroom hotel, a 15,000-capacity venue, an equestrian centre, a heliport, an 18-hole golf course, a racecourse, and retail units.
- Floor area
- 161,374 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The tipperary venue -mixed use leisure campus comprising: a) demolition of all existing buildings on site comprising 5no. Dwelling houses; 1no. Derelict dwelling house; 1no. Commercial warehouse/storage build; agric. Outbuildings. Total gfa of buildings to be demolished is 2,872sq. M. B) construction of: i) 500 bedroom hotel build. (80,577sq. M. ) ii) 15,000 person capacity venue build. (23,362sq. M. -to accommodate sports, concerts & other events. Iii) equestrian centre (5,872sq. M. ) iv) heliport (2,383sq. M. ) v) 18 hole golfcourse & ancillary golf club build. (3,462sq. M. ) vi) driving range & ancillary build. (484sq. M. ) vii) chapel (255sq. M. ) viii) 31no. Retail units (2,883sq. M. ) ix) hoban memorial build. (1,984sq. M. ) to accommodate banqueting suite & museum with reproduction lafayette park & subterranean link to proposed hotel build. X) grade 1 race course (c. 23.5ha) & greyhound track (c. 0.36ha) with shared ancillary builds. (40,358sq. M. ) xi) single storey energy centre build. (1,530sq. M. ) xii) treatment plant (252sq. M. ) c) provision of all associated landscaping, boundary treatment & site developement works includ. : i) diversion of existing site services. Ii) revised surface water drainage regime includ. Diversion & culverting of parts of derheen & clover rivers. Relocation of an attenuation pond adjacent to the two mile borris interchange. Iii) drilling for a potable water supply (on site) to serve proposed development. Iv) provision of 5743no. Car parking spaces; 136 bus parking spaces; 72no. Greyhound box spaces; 100 horse box spaces. V) provision of new 4-arm roundabout on r639 to serve proposed develop. Provision of emergency only access rd. With priority junction onto r639. Vi) link rd. To connect r639 (via new 3-arm roundabout) to recently constructed two mile borris grade separated junction on m8 & construct 2no. Slip lanes to complete the diamond interchange. Widening of approaches to roundabouts at two mile borris interchange to allow two way flow. Segregated left turn lane (on existing southbound diverge) to allow traffic to join proposed lind rd in a free flow manner. Termination of existing accommod. Rd (on sth. Side of new link rd) & new access onto northern side of link rd. For exist. Accomm. Rd. Total gfa of entire develop. 163,091sq. M. The planning application is accompanied by an environmental impact statement (eis). A waste licence will be required in respect of this development. (previous ref. 09/51/0624)
Key dates
Timeline
- Application received8 December 2017
- Decision due10 February 2018
- Decision issued6 February 2018
- Permission expiry22 March 2023
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decision140 m away
(1)modific. to permitted develop. Ref. 09/51/0624 (ABP REF.PL.22.237958) Redesign of layout extent of…
Noard NewhillLeigh and Borris , Two Mile Borris
17601167TipperaryLodged 23 Oct 2017Other
- Granted150 m away
(1)modific. to permitted develop. Ref. 09/51/0624 (ABP REF.PL.22.237958) Redesign of layout extent of…
Noard NewhillLeigh and Borris , Two Mile Borris
17601351TipperaryLodged 8 Dec 2017Commercial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionOther
(1)modific. to permitted develop. Ref. 09/51/0624 (ABP REF.PL.22.237958) Redesign of layout extent of…
Noard NewhillLeigh and Borris , Two Mile Borris
17601167TipperaryLodged 23 Oct 2017
- GrantedCommercial
Constr. of a new grandstand & assoc. facilities, & infrastructure incl. hospitality/conference suites,…
The Curragh Racecourse , The Curragh , Co. Kildare in the townlands of The Curragh & Loughbrown
16149KildareLodged 19 Feb 2016
- GrantedCommercial
A mixed commercial, retail, retail warehouse, leisure and residential building complex on a site of 3.256…
Site of 3.256 ha. to the southwest of, Junction of Whitestown Way & Tallaght Bypass, In The Townland of Whitestown, Tallaght, Dublin 24
SD03A/0320South DublinLodged 12 Feb 2004
- Awaiting decisionCommercial
Construction of 2 no. 18 hole golf courses and associated practice areas, reserved site for future clubhouse…
Ballinrea, Ballinimlagh, Ballinrea South,
094297corkLodged 2 Feb 2009
- GrantedInfrastructure
The development will consist of a GAA Cluster Facility including: a) 3 no. floodlit GAA pitches (Pitches No's…
Townlands Of Tymon North And Templeogue, Spawell Golf and Leisure Centre, Templeogue, Dublin 6W, D6W PY06
SD23A/0304South DublinLodged 18 Oct 2024
- Awaiting decisionChange of use
The proposed development consists of: (1) The partial demolishing of former Hotel buildings ranging in height…
Baltimore Harbour Hotel & Leisure Centre, Baltimore, Co Cork,
1586corkLodged 27 Feb 2015
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.