Wallers Lot, Cashel, Co Tipperary
Construction of a compressed natural gas refuelling facility and retention of parking modifications at a motorway services area.
18600320 · Tipperary County Council · Lodged 15 March 2018
- Reference
- 18600320
- Authority
- Tipperary County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 15 March 2018
Summary
AI-generatedThe project involves building a compressed natural gas refuelling facility and 13 new car parking spaces at the Topaz Motorway Services Area. It also seeks retention permission for modifications to the permitted parking layout, including a reduction in parking, revised site levels, drainage, road markings, public lighting, and two temporary storage structures.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The construction of a compressed natural gas refuelling facility as part of the motorway services area and 13 no new car parking spaces and permission for retention of modifications to the parking layout permitted under application register reference 15600414, including a reduction in parking and consequent revisions to the site levels, drainage, road markings and public lighting, and 2 no temporary storage structures at the topaz motorway services area, junction 8 on the m8 motorway
Built & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 22 July 2019. A completion certificate was lodged on 8 February 2021.
Notified floor area: 18.5 m²
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received15 March 2018
- Further information requested4 May 2018
- Further information received25 July 2018
- Decision due21 August 2018
- Decision issued20 August 2018
- Grant issued24 September 2018
- Permission expiry23 September 2023
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decisionAt this site
The construction of a compressed natural gas refuelling facility as part of the Motorway Services Area and 13…
Wallers Lot , Cashel , Co Tipperary
18600239TipperaryLodged 27 Feb 2018Commercial
- Granted40 m away
Development consisting of the (I) demolition of existing substation, and (ii) construction of a new…
Circle K Motorway Services Area , Junction 8 M8 Motorway , Waller's Lot Cashel
19600597TipperaryLodged 31 May 2019Infrastructure
- Granted50 m away
(i) modifications to the existing internal floor layout at ground floor level, totaling 35sqm in area, to…
Circle K Cashel Motorway Services Area , Junction 8 on the M8 Motorway Waller's-Lot , Cashel Co. Tipperary
2460099TipperaryLodged 14 Feb 2024Commercial
- Granted50 m away
A change of use from permitted retail use to retail use including the sale of alcohol for consumption off the…
Circle K Cashel Service Station , Junction 8 on the M8 Motorway Waller's-Lot , Cashel Co. Tipperary
2360316TipperaryLodged 12 May 2023Change of use
- Awaiting decision50 m away
The development will consist of (i) Demolition of existing substation, and (ii) Construction of a new…
Circle K Motorway Services Area , Junction 8 M8 Motorway , Wallers Lot Cashel
19600536TipperaryLodged 17 May 2019Commercial
- Granted60 m away
A High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle…
Circle K Motorway Service Area , Junction 8 M8 Motorway , Wallers Lot Cashel
18601043TipperaryLodged 24 Aug 2018Infrastructure
- Awaiting decision60 m away
A High Power Electric Vehicle Charging Station consisting of the: (i) Installation of 6 no. electric vehicle…
Circle K Motorway Services Area , Junction 8 M8 Motorway , Waller's Lot Cashel
18600952TipperaryLodged 30 Jul 2018Energy
- Awaiting decision60 m away
Development consisting of the provision of an internally illuminated two-sided totem sign with a total height…
Junction 8 of the M8 Motorway , Wallers Lot , Cashel
19601030TipperaryLodged 18 Sept 2019Commercial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionCommercial
The construction of a compressed natural gas refuelling facility as part of the Motorway Services Area and 13…
Wallers Lot , Cashel , Co Tipperary
18600239TipperaryLodged 27 Feb 2018
- GrantedCommercial
Permission for the development of a 24 hour opening Motorway Service Area to include — Vehicle fuelling…
At R704 , Garrandarragh , Mullinavat
17456KilkennyLodged 10 Jul 2017
- GrantedInfrastructure
The development 1 No. single storey CNG (compressed natural gas) compressor installation with a floor area of…
Mayfield , Monasterevin , Co. Kildare.
201475KildareLodged 3 Dec 2020
- GrantedCommercial
Proposed works — Alteration to a portion of the existing carpark layout to the western side of the site to…
Ardmanagh and Meenvane, Schull, Co. Cork,
2228corkLodged 21 Jan 2022
- Awaiting decisionRetention
Permission for Retention and Completion of Redevelopment of Existing Filling Station Forecourt for an…
Brady's Filling Station , Dublin Road , Cavan
2360077CavanLodged 30 Jun 2023
- RefusedRetention
Of variations to existing service station building as constructed, retention permission is also sought for…
Carrowkell ,
18648galwayLodged 17 May 2018
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.