Planning Permission Ireland
GrantedIndustrialDecided 3 July 2018

Killough Hill, Gaile, Holycross

Establishment of an enclosed limestone processing facility within an existing quarry in Holycross.

18600579 · Tipperary County Council · Lodged 9 May 2018

Reference
18600579
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
9 May 2018

Summary

AI-generated

The development proposes an enclosed limestone processing facility with a floor area of 600 square metres and a maximum height of 30 metres. The works on the 0.8-hectare site will include lowering the existing ground levels by approximately 7 metres.

Industrialquarryindustriallimestone
Floor area
600 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The establishment and operation of an enclosed limestone processing facility (area 600 sq. Metres and max. Height 30 metres), and associated ancillary infrastructure on a 0.8 hectare site within the existing quarry landholding. The development will include the lowering of existing ground levels by c. 7 meters.

Key dates

Timeline

  1. Application received9 May 2018
  2. Decision due3 July 2018
  3. Decision issued3 July 2018
  4. Grant issued7 August 2018
  5. Permission expiry6 August 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.