Planning Permission Ireland
GrantedAlterationsDecided 18 April 2019

Gortnahoe, Thurles, Co. Tipperary

Alterations to a sports facility layout, including relocating the stand, walking track, and parking.

19600201 · Tipperary County Council · Lodged 7 March 2019

Reference
19600201
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
7 March 2019

Summary

AI-generated

The application seeks permission for minor alterations to a previously approved sports facility layout. This includes relocating the existing stand, adjusting the pitch layout with ball stops, relocating a gravel walking track with 5m high lamp standards, and rearranging car parking spaces.

Alterationssportsamenity

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The following: a) minor alteration to pitch layout with ball stops to each end from previously granted permission ref no. 17/600145, b) to deconstruct and re-construct existing stand in new location as shown on drawings, c) relocate gravel walk track/path around the site with 5m high lamp standards along same, d) relocating additional car parking spaces as proposed from the previous application ref no. 17/600145 to new location as shown on submitted plans with all associated site works, drainage and ancillary works, note: the boundary of this development has been altered from the previously submission ref. No. 17/600145, additional land has been obtained from the adjoining landowner to facilitate the minor adjustments

Land-use zoning

What this land is zoned for

AmenityOS
To provide, preserve and enhance open space and amenity uses

National zoning type: Open space, park

Objective set by the Tipperary County Development Plan 2022_2028 Settlement Plans (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Melbourne House, Main St, Gortnahole ThurlesMar 2026€165,000175 m
Gortnahoe Village, Thurles, TipperaryDec 2025€192,500194 m
9 Kilcooley Way, Gortnahoe, Thurlesnot full market priceSept 2025€90,000199 m
4 Kilcooley Way, Gortnahoe, ThurlesApr 2026€248,000201 m
Boulick Gorthahoe, Thurles, TipperaryMar 2026€135,000296 m
5 Patricks Gate, Gortnahoe, ThurlesApr 2026€200,000363 m
Buolick, Gortnahoe, Thurlesnot full market priceMay 2025€100,000445 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 March 2019
  2. Decision due1 May 2019
  3. Decision issued18 April 2019
  4. Grant issued23 May 2019
  5. Permission expiry22 May 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.