Planning Permission Ireland
GrantedHousing estateDecided 22 October 2019

No 12 Sarsfield Street, Slieve Na Mban Meadows (Slievenamon Meadows), Davis Road

Demolition of a boundary wall and construction of four terraced houses with solar panels.

19600957 · Tipperary County Council · Lodged 29 August 2019

Reference
19600957
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
29 August 2019
Residential units
4
Floor area
1689.6 m²

Summary

AI-generated

The project involves the demolition of an existing boundary wall and the construction of four three-bedroom, two-storey terraced houses. The development will feature solar panels on the roofs, new pedestrian and vehicular entrances, a public footpath, and street lighting.

Housing estatesolardemolitionterraced housing
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construction of 4 in total, 3 bedroom, 2 storey terraced dwellinghouses with entrances onto to slieve na mban meadows (slievenamon meadows), & pedestrian entrances onto davis road, demolition of boundary wall, new public footpath, street light, boundary walls/fences, connection to mains water supply, connection to mains sewer and mains storm water drain, solar panels on the roof of those dwelling houses and all associated site works

Land-use zoning

What this land is zoned for

Existing ResidentialRS
Provide for residential development and protect and improve residential amenity

National zoning type: Existing residential

Objective set by the Thurles and Environs Local Area Plan 2024-2030 (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
No 24 Ardlui, Sliabh Na Mban Meadows, ThurlesMay 2026€354,0004 m
Slieveramsh Rd, Thurles, TipperaryMar 2026€260,00077 m
8 Sarsfield St, Thurles, TipperaryAug 2025€250,00085 m
17 Sarsfield St, Thurles, Tipperarynot full market priceMar 2026€245,00089 m
2 Derheen, Thurles, Co TipperaryFeb 2025€190,000124 m
4 Cuan Mhuire, Slievenamon Rd, ThurlesNov 2025€333,000127 m
Slievenamon Rd, Thurles, TipperaryFeb 2026€347,000136 m
7 Fontenoy Terrace, Stradavoher, ThurlesApr 2026€182,000174 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 August 2019
  2. Decision due23 October 2019
  3. Decision issued22 October 2019
  4. Appeal submitted14 November 2019
  5. Appeal decided10 March 2020
  6. Permission expiry9 March 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.