Knockanattin and Broomhill, Ballingarry, Co. Tipperary
Construction of a 150-metre wind turbine and substation in Ballingarry.
19601312 · Tipperary County Council · Lodged 26 November 2019
- Reference
- 19601312
- Authority
- Tipperary County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 26 November 2019
Summary
AI-generatedPermission is sought for a single wind turbine with a tip height of up to 150 metres. The development includes a crane hardstand, a 20kV substation building, underground cabling, and a new access track.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The construction of one (1) wind turbine with an overall tip height of up to 150 metres. The construction of a crane hardstand area located beside the turbine. The construction of a 20kv substation building with associated electrical plant, equipment, and security fence. The construction of internal windfarm underground cabling. The construction of a new site access track. Installation of a drainage system for the proposed hardstand and road areas and all associated site development and ancillary works
Key dates
Timeline
- Application received26 November 2019
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionEnergy
The construction of one (1) wind turbine with an overall tip height of up to 150 metres. The construction of…
Knockanattin and Broomhill , Ballingarry , Co. Tipperary
19601392TipperaryLodged 13 Dec 2019
- Awaiting decisionEnergy
Construction of one wind turbine generator (with a maximum hub height of up to 76 metres, a maximum rotor…
Moneygorm, Glenville, Co. Cork,
116017corkLodged 20 Sept 2011
- Awaiting decisionEnergy
Erection of 150kW wind turbine 40 metres high with a blade diameter of 27 metres, a new access roadway…
Hilltop Farm, Turbeagh, Mitchelstown, Co.Cork
144428corkLodged 4 Mar 2014
- RefusedEnergy
The construction of one 4.2MW wind turbine with an overall tip height of up to 150m, the construction of the…
Loughanstown , Co Westmeath
21666WestmeathLodged 16 Dec 2021
- Awaiting decisionEnergy
Erect a 150kw wind turbine 40 metre high with a blade diameter of 27 metres, a new access roadway connecting…
Hilltop Farm, Turbeagh, Mitchelstown,
144260corkLodged 12 Feb 2014
- Awaiting decisionEnergy
Construction of a wind farm consisting of 6 turbines (each with a maximum hub height of 100m, maximum rotor…
Derragh & Rathgaskig near Ballingeary, Co. Cork, .,
125098corkLodged 23 May 2012
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.