Planning Permission Ireland
Awaiting decisionEnergy

Sandymount Farms, Ballingarry, Roscrea

Construction of a 1MW biomethane anaerobic digestion facility in Roscrea.

201285 · Tipperary County Council · Lodged 3 November 2020

Reference
201285
Authority
Tipperary County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
3 November 2020

Summary

AI-generated

Permission is sought for a 1MW Anaerobic Digestion biomethane facility utilizing agricultural feedstocks. The development on a 2.31-hectare site includes a reception building, digester and storage tanks, a CHP plant, and associated infrastructure.

Energybiomethanerenewable energyagricultureinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The construction and operation of an agricultural feedstock based 1mw anaerobic digestion (ad) biomethane facility producing renewable energy facility utilising 29,800 tonnes per annum of agriculture sourced feedstocks, the proposed development will occupy an area of 2.31 hectares (5.71 acres) and will include the following elements: 1 no. Single storey reception building with welfare facilities, staff and visitor car-parking, 1 no. Truck delivery and pickup hardstanding area, 1 no. Site perimeter low level bund, 1 no. Overground water storage tank, 2 no. 40ft storage containers, 1 no. 20ft storage container, 1 no. Propane storage tank, 1 no. Methane storage tank, 1 no. Feedstock hopper/feeder, 1 no. Wheel wash, 1 no. Rainwater harvesting system, 1 no. Underground rainwater storage tank, 1 no. Weighbridge, 2 no. Anaerobic digester tanks, 2 no. Digestate storage tanks, 1 no. Slurry storage tanks, 4 no. Feed-stock clamps, 1 no. Biogas and biomethane flare, condensate trap and pump, 1 no. 500 kwchp plant, 1 no. Pump and control room container, 1 no. Biogas cleaning and upgrading container, 1 no. Biogas compression container, 2 no. Water interceptor units, 1 no. Surface water soak-away designed to bre365, surface water and feedstock leachate management infrastructure, 1 no. 6 pe wastewater treatment system, 1 no. Esb substation, new entrance off l1071, external perimeter stockproof fencing and gates, landscaping and tree screening and associated site works

Key dates

Timeline

  1. Application received3 November 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.