Planning Permission Ireland
Awaiting decisionEnergy

Drominagh, Nenagh, Co. Tipperary

Temporary four-year permission for an existing 10-metre meteorological mast.

201350 · Tipperary County Council · Lodged 17 November 2020

Reference
201350
Authority
Tipperary County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
17 November 2020

Summary

AI-generated

An application for a four-year temporary permission to continue operating a 10-metre-high lattice meteorological mast. The mast is supported by cable stays on a pre-cast base on agricultural lands.

Energywind energymasttemporary
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A four year temporary permission for the continued operation of a meteorological mast, which was previously granted temporary permission under reg. Ref. 17600650, consisting of a lattice tower standing approximately 10 m high and mounted on a pre-cast triangular block measuring 2.5 m by 2.5 m by 2.5 m in area and supported in place by 3 no. Cable stays mounted inot the pre-case base. The mast supports an enclosure (measuring 0.315 m x 0.415 m) at the bottom of the tower which holds the battery pack with instruments mounted at a number of heights on the tower, located on agricultural lands

Key dates

Timeline

  1. Application received17 November 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.