Planning Permission Ireland
GrantedCommercialDecided 18 March 2021

Hackett's Pharmacy, The Square, Tullow Newport

Interconnection of two buildings to expand a pharmacy, create a first-floor apartment, and retain an illuminated sign.

201447 · Tipperary County Council · Lodged 3 December 2020

Reference
201447
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
3 December 2020

Summary

AI-generated

The project involves interconnecting two existing buildings to extend the ground and basement levels of a pharmacy. It will also create a new two-bedroom apartment on the first floor, install a new shopfront, and retain an existing illuminated pharmacy sign.

Commercialpharmacyapartmentshopfrontretention
Residential unit
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(a) the interconnection of 2 no. Existing buildings to extend the existing pharmacy, associated staff facilities and storage at ground floor and basement floor levels, (b) interconnection of the 2 no. Existing buildings to create 1 no. 2 bedroom apartment at first floor level, (c) associated alterations to existing buildings external alterations to accommodate proposed new internal layout and reconfiguration, (d) new shop frontage complete with illuminated building signage, (e) all associated site works. Retention permission for the existing external illuminated pharmacy sign

Land-use zoning

What this land is zoned for

Town / Village CentreUC
To provide and enhance village centre facilities to improve the service provision to the rural hinterland

National zoning type: City/Town/village Centre, central area

Objective set by the Tipperary County Development Plan 2022_2028 Settlement Plans (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 27 August 2022. A completion certificate was lodged on 27 April 2023.

Notified floor area: 199.99

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
1 Ballygasheen Ballinaclough, Nenagh/newport, Co. TipperaryMay 2025€10,00039 m
Cork Rd, Newport, TipperaryMar 2025€220,00084 m
Cork Road, Newport, Co. TipperaryDec 2025€200,000119 m
2 Mulcair Court, Black Rd, NewportJul 2025€180,000191 m
Apt 3, Mulcair Court, Black RdAug 2025€200,000192 m
8 Ard Mhuire, Newport, Co. TipperaryApr 2026€200,000256 m
1 �rd Mheallain, Newport, Co. TipperaryNov 2025€205,000288 m
119 Glencree, Newport, TipperaryJul 2025€300,000335 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received3 December 2020
  2. Further information requested29 January 2021
  3. Further information received3 March 2021
  4. Decision due30 March 2021
  5. Decision issued18 March 2021
  6. Grant issued21 April 2021
  7. Permission expiry20 April 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.