Planning Permission Ireland
GrantedEnergyDecided 24 February 2021

Farranrory Upper Farranrory Lower Coolnashinnagh and Gortnasmuttaun, Co. Tipperary

A 10-year planning permission for a 9-turbine wind farm with a maximum blade tip height of 150 metres.

20972 · Tipperary County Council · Lodged 1 September 2020

Reference
20972
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
1 September 2020

Summary

AI-generated

The proposed renewable energy development will have a 40-year operational life and spans lands in both Tipperary and Kilkenny. It includes 9 turbines up to 150m tall, new and upgraded site entrances, access roads, underground cabling, and a new meteorological mast.

Energywind farmrenewable energyinfrastructure
Residential units
9

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • A ten year planning permission for a renewable energy development with a 40-year operational life (from the date of commissioning of the renewable energy development). The entirety of the development constitutes the provision of a 9-turbine wind farm and all associated works on lands in both counties tipperary and kilkenny. This development comprises part of an overall development for which planning permission is also sought for a 38kv substation in the townland of killeen, co. Kilkenny. A separate planning application will be made for an underground grid connection to tipperary county council and to kilkenny county council. The proposed development will constitute the provision of the following
  • Construction of up to 9 turbines each with a maximum overall ground to blade tip height of up to 150 metres and associated foundations and hardstand areas
  • Construction of new site entrances and upgrade of existing site entrances
  • Internal wind farm underground power and communications cabling
  • Upgrade of existing access tracks and provision of new site access roads
  • Removal of existing meteorological masts and construction of 1 new meteorological mast for monitoring wind speeds with a maximum height of up to 85 metres
  • Site drainage network
  • Construction of a new temporary site compound for use during construction
  • Two borrow pits
  • Construction of a new on-site 38kv substation the planning application will be accompanied by an environmental impact assessment report (eiar) and natura impact statement

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 31 March 2025.

Notified floor area: 80.8

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received1 September 2020
  2. Further information requested22 October 2020
  3. Further information received23 December 2020
  4. Decision due25 February 2021
  5. Decision issued24 February 2021
  6. Grant issued30 March 2021
  7. Permission expiry29 March 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.