Planning Permission Ireland
Awaiting decisionEnergy

Knockroe Kilnagranagh Newtowndrangan Tullowcussaun Ballyvadlea Ballyhomuck Kilburry West Milestown Bannixtown Quartercross Clare More Killusty North Killusty South Kiltinan Loughcapple Grange Beg Miltown Britton Mullenranky Kilmore, Ballinvoher Redm

A ten-year permission for a wind farm of up to seven turbines and associated infrastructure.

211477 · Tipperary County Council · Lodged 7 October 2021

Reference
211477
Authority
Tipperary County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
7 October 2021

Summary

AI-generated

The development consists of up to 7 wind turbines with a maximum tip height of 150m, a 30m meteorological mast, and a 38kV electrical substation. It also includes 19km of underground cabling along public roads, demolition of 2 derelict buildings, and 2 cattle underpasses.

Energywind farmrenewableinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A ten-year permission of a wind farm project. The development will consist of: construction of up to 7 no. Wind turbines with a maximum overall tip height of 150m, comprising a tower of between 75-95m high, to which three blades of between 55-70m in length will be attached; associated hard stand areas at each turbine; 1 no. 30m permanent meteorological mast and all associated infrastructure and works; 1 no. 38kv electrical substation and all associated infrastructure and works; 20kv underground cables facilitating the connection of turbines to 38kv electrical substation and all associated infrastructure and works; circa 19km of 38kv underground cabling and all associated works along public roads to facilitate the connection of the proposed 38kv wind farm electrical substation to the existing 38/110kv doon substation in the townland of ballyvaughan; provision of a new site entrance on the l2035; upgrading of existing agricultural tracks and construction of new site tracks and all associated works as required; a temporary site compound and all associated works; demolition of 2 no. Derelict buildings; provision of 2 no. Cattle underpasses circa 400m and circa 580m to the east of the new site entrance; and all associated infrastructure and site development works. The proposed underground cabling works located within the public road corridor cross protected structure rps s121 (loughcapple bridge). An environmental impact assessment report (eiar) and natura impact statement (nis) have been prepared in respect of the proposed development and will be submitted with the application

Key dates

Timeline

  1. Application received7 October 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.