Planning Permission Ireland
GrantedRetentionDecided 16 February 2022

Carrick Street, Mullinahone, Co. Tipperary

Retention of changes made to a rear extension and main house, including solar panels, windows, and stone finishes.

211820 · Tipperary County Council · Lodged 15 December 2021

Reference
211820
Authority
Tipperary County Council
Register status
Decided
Type
RETENTION
Received
15 December 2021

Summary

AI-generated

This application seeks retention permission for changes made during the refurbishment and extension of an existing dwelling. Specifically, it covers altered windows and doors, roof lights, solar PV panels on the rear extension, and stone and plaster finishes on the elevations.

Retentionsolarrenovation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Changes to planning permission ref 18/601008 to remove an existing single storey extension, a shed and out buildings to the rear of the dwelling and to construct a single storey extension to the rear with refurbishments to the existing dwelling. Retentions are 1 to retain windows, doors and roof lights on the rear extension which differs from the fenestration on the original planning application. 2 to retain solar pvs mounted on the rear extension roof. 3 to retain a stone finish to the front elevation and traditional plaster finish to the side and rear elevations of the original structure and the rear extensions elevations and 4 to retain velux roof lights to the rear roof of the original structure on our lands

Land-use zoning

What this land is zoned for

Town / Village CentreUC
To provide and enhance village centre facilities to improve the service provision to the rural hinterland

National zoning type: City/Town/village Centre, central area

Objective set by the Tipperary County Development Plan 2022_2028 Settlement Plans (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Kyltlea, Mullinahone, Co TipperaryMay 2025€365,00055 m
Ballylanigan, Mullinahone, TipperaryMay 2025€73,50055 m
Ballyrichard, MullinahoneJul 2025€40,00055 m
32 Cois Na Habhann, Mullinahone, County TipperaryDec 2025€310,000222 m
6 Glen Dara, Beeverstown, MullinahoneApr 2026€425,000374 m
3 Glen Dara, Beeverstown, MullinahoneFeb 2025€365,000419 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 December 2021
  2. Decision due17 February 2022
  3. Decision issued16 February 2022
  4. Grant issued22 March 2022
  5. Permission expiry21 March 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.