Planning Permission Ireland
GrantedInfrastructureDecided 12 July 2022

Cloughjordan Ecovillage, Oxpark & Townfields, Cloughjordan Co. Tipperary

Installation of streetlighting, footbridges, road works, and security fencing at Cloughjordan Ecovillage.

2260236 · Tipperary County Council · Lodged 19 May 2022

Reference
2260236
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
19 May 2022

Summary

AI-generated

The proposed works include installing a streetlighting network, erecting two pedestrian footbridges, and completing road turning bays and traffic ramps. It also involves repairing footpaths, erecting security fencing around the wastewater treatment plant and pumping station, and connecting a water main.

Infrastructureinfrastructurelightingfootbridgefencing

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Installation of a streetlighting network comprising lighting columns and fixtures above and below ground level and all ancillary works; erection of 2 no. Pedestrian footbridges and associated foundations; complete road turning bays and construction of traffic ramps to taken in charge standards; complete road signage and road markings to taken in charge standards; repair of identified existing footpaths/greenways; erection of security fencing around waste water treatment plant; erection of security fencing around sewage pumping station; connection of water main at step road entrance and installation of tarmacadam at step road entrance; and all ancillary works

Land-use zoning

What this land is zoned for

Existing ResidentialRS
To preserve and enhance existing residential amenity including provision of additional facilities for settlements where gaps are identified in the DIA

Objective set by the Tipperary County Development Plan 2022_2028 Settlement Plans (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
1 Ard Na Gcapaill, Cloughjordan, Tipperarynot full market priceSept 2025€93,800129 m
Apt. 4 Taobh An Tsruthan, The Village, Cloughjordannot full market priceMar 2026€15,000132 m
5 An Cosan Cuil, Oxpark, CloughjordanJan 2025€275,000229 m
Main St, Cloughjordon, TipperaryJun 2026€350,000360 m
1 Bothar Mhuire, Cloughjordan, TipperaryOct 2025€225,000369 m
Main St Lower, Cloughjordan, TipperaryNov 2025€178,000371 m
Bracken House Cloughjordan, Tipperarynot full market priceMay 2026€240,000426 m
Main St, Cloughjordan, TipperaryMar 2026€80,000469 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 May 2022
  2. Decision due13 July 2022
  3. Decision issued12 July 2022
  4. Grant issued15 August 2022
  5. Permission expiry14 August 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.