Derryville, Co. Tipperary, Tipperary
A 10-year planning permission for a major BioProducts Campus including composting, anaerobic digestion, and biorefinery facilities.
2260395 · Tipperary County Council · Lodged 28 July 2022
- Reference
- 2260395
- Authority
- Tipperary County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 28 July 2022
Summary
AI-generatedA 10-year planning permission is sought for a BioProducts Campus accepting up to 80,000 tonnes of waste material. The development will feature an integrated compost and growing media facility, an anaerobic digestion facility with three digester tanks and gas engines, a biorefinery building, and a bioenergy facility with a biomass boiler.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
A 10-year planning permission for development of a bioproducts campus. The bioproducts campus development consists of an integrated compost / growing media facility and anaerobic digestion facility as well as a biorefinery. The compost / growing media facility comprises 1 no. Composting building (incorporating feedstock intake area, storage area, in-vessel tunnels, workshop), solar panels at roof level, associated biofilter and liquid storage tanks, 1 no. Maturation building and 1 no. Office building. The anaerobic digestion facility comprises 3 no. Digester tanks, 2 no. Digestate storage tanks, 2 no. Biogas fuelled electricity generating gas engines, 3 no. Biogas processing units, associated storage tanks, bunding, plant and 1 no. Gas flare. The biorefinery includes 1 no. Building (incorporating a goods inward area, processing area, drying room, process control rooms, a laboratory and offices), associated feedstock storage tanks; a bioenergy facility comprising 1 no. Biomass boiler building, associated water storage tank, 1 no. Materials storage building. The integrated compost / growing media facility and anaerobic digestion facility will accept up to 80,000 tonnes of waste materials per annum. Provision of new site access from the r502, internal access roads and hardstanding, car parking, fire water tank and retention pond, esb substation and pump house, 4 no. Weighbridges, entrance gate and security fence. The proposed development includes all ancillary site development, landscaping and boundary treatment works above and below ground. The application relates to development which comprises or is for the purposes of an activity requiring an industrial emissions licence. An environment impact assessment report will be submitted with this application.
Built & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 19 June 2023.
Notified floor area: 2,403 m²
2 commencement notices are linked to this development.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received28 July 2022
- Further information requested20 September 2022
- Further information received3 October 2022
- Decision due27 November 2022
- Decision issued21 November 2022
- Grant issued3 January 2023
- Permission expiry2 January 2028
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
Permission for the proposed development will consist of the completion of the Renewable Biogas Plant as…
Inchera Little Island Co.Cork
25/5034corkLodged 3 Jun 2025
- RefusedEnergy
For the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be…
Glenloughaun , Ballinasloe , Co. Galway
2561691galwayLodged 18 Nov 2025
- Awaiting decisionEnergy
A renewable biomethane facility on a c 2.75 hectare site to produce renewable energy and organic fertiliser.…
Oberstown , Ardee , Co. Louth
2360175LouthLodged 21 Jun 2023
- GrantedEnergy
The construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be…
Curraghnagarraha Reatagh and Curraghballintlea , Carrick-on-Suir , Co. Waterford
2460536WaterfordLodged 17 Sept 2024
- Awaiting decisionEnergy
For development of a Biogas Plant on a 7.85 hectare site. The Biogas Plant will utilise anaerobic digestion…
Gort Kinincha & Glenbrack ,
18502galwayLodged 25 Apr 2018
- GrantedEnergy
Bio-energy facility containing a reception building comprising of reception area, engine room, pumps and heat…
Newdown , The Downs , Mullingar
206101WestmeathLodged 23 Apr 2020
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.