GrantedIndustrialDecided 21 November 2022

Derryville, Co. Tipperary, Tipperary

A 10-year planning permission for a major BioProducts Campus including composting, anaerobic digestion, and biorefinery facilities.

2260395 · Tipperary County Council · Lodged 28 July 2022

Reference
2260395
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
28 July 2022

Summary

AI-generated

A 10-year planning permission is sought for a BioProducts Campus accepting up to 80,000 tonnes of waste material. The development will feature an integrated compost and growing media facility, an anaerobic digestion facility with three digester tanks and gas engines, a biorefinery building, and a bioenergy facility with a biomass boiler.

Industrialbioenergywaste managementindustrialbiorefinery

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A 10-year planning permission for development of a bioproducts campus. The bioproducts campus development consists of an integrated compost / growing media facility and anaerobic digestion facility as well as a biorefinery. The compost / growing media facility comprises 1 no. Composting building (incorporating feedstock intake area, storage area, in-vessel tunnels, workshop), solar panels at roof level, associated biofilter and liquid storage tanks, 1 no. Maturation building and 1 no. Office building. The anaerobic digestion facility comprises 3 no. Digester tanks, 2 no. Digestate storage tanks, 2 no. Biogas fuelled electricity generating gas engines, 3 no. Biogas processing units, associated storage tanks, bunding, plant and 1 no. Gas flare. The biorefinery includes 1 no. Building (incorporating a goods inward area, processing area, drying room, process control rooms, a laboratory and offices), associated feedstock storage tanks; a bioenergy facility comprising 1 no. Biomass boiler building, associated water storage tank, 1 no. Materials storage building. The integrated compost / growing media facility and anaerobic digestion facility will accept up to 80,000 tonnes of waste materials per annum. Provision of new site access from the r502, internal access roads and hardstanding, car parking, fire water tank and retention pond, esb substation and pump house, 4 no. Weighbridges, entrance gate and security fence. The proposed development includes all ancillary site development, landscaping and boundary treatment works above and below ground. The application relates to development which comprises or is for the purposes of an activity requiring an industrial emissions licence. An environment impact assessment report will be submitted with this application.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 19 June 2023.

Notified floor area: 2,403

2 commencement notices are linked to this development.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received28 July 2022
  2. Further information requested20 September 2022
  3. Further information received3 October 2022
  4. Decision due27 November 2022
  5. Decision issued21 November 2022
  6. Grant issued3 January 2023
  7. Permission expiry2 January 2028

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.