Fethard Wastewater Treatment Plant, Moneypark, Fethard Co. Tipperary
Major upgrade of the Fethard Wastewater Treatment Plant including new tanks, substation, and flood prevention works.
2360207 · Tipperary County Council · Lodged 28 March 2023
- Reference
- 2360207
- Authority
- Tipperary County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 28 March 2023
Summary
AI-generatedThe project involves upgrading the existing wastewater treatment plant with new pumps, screening works, aeration and stormwater tanks, a chemical dosing system, and a new ESB substation. It also includes widening the vehicular entrance and creating a floodwater compensatory storage area.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The upgrade of the existing wastewater treatment plant, comprising of the replacement of the existing inlet pumps with new larger pumps; the decommissioning of the existing inlet works; the construction of a new inlet screening works area with greater capacity than existing inlet screening works, anoxic and aeriation tanks, a clarifier, a stormwater storage tank, a new chemical dosing system consisting of 2 no. Above-ground storage tanks and associated equipment, a kiosk to house control equipment and a flow splitting chamber (all above ground); the construction of a new esb mv substation and customer switch room building; and ancillary development including the widening of the existing vehicular entrance to the facility from the access road, the provision of new internal concrete roadway, footpaths and hardstanding areas, associated underground chambers, cabling and piping, internal site lighting, fencing, site landscaping and all associated site development works. The associated development works will include the creation of an approx. 1,250m2 floodwater compensatory storage area and the raising of approximately 2,740m2 of lands for flood prevention purposes at the wwtp extension site. A natura impact statement has been prepared in respect of this planning application
Key dates
Timeline
- Application received28 March 2023
- Decision due22 May 2023
- Decision issued18 May 2023
- Grant issued21 June 2023
- Permission expiry20 June 2028
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedInfrastructure
The proposed development will consist of the upgrade of the existing wastewater treatment plant to increase…
Cahir Wastewater Treatment Plant , Carrigeen , Cahir
21402TipperaryLodged 29 Mar 2021
- GrantedInfrastructure
The upgrade of the existing wastewater treatment plant, comprising of the construction of a new above ground…
Longford , Longford Bridge , Tipperary Town
211018TipperaryLodged 14 Jul 2021
- GrantedInfrastructure
Upgrading of existing waste water treatment plant to increase the treatment capacity comprising of the…
Ballina Waste Water Treatment Plant , Ballina , Co. Tipperary
21487TipperaryLodged 13 Apr 2021
- GrantedInfrastructure
The construction of a new Inlet Pump Station, a new Balance Tank, and a new Aeration Tank to replace the…
Mullinoly , Mullinahone , Co. Tipperary
21136TipperaryLodged 9 Feb 2021
- Awaiting decisionInfrastructure
For (i) Demolition and replacement of existing Inlet works; (ii) SWO outfall from existing Storm Water Tank…
Bailieborough Wastewater Treatment Plant , Shercock Road Beckscourt Bailieborough , Co. Cavan
2560303CavanLodged 13 Jun 2025
- GrantedInfrastructure
Upgrade the existing wastewater treatment plant to a capacity of 900 PE incorporating: selector tank, twin…
Ballyroan , Co.Laois
19328LaoisLodged 10 Jun 2019
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.