Fethard Wastewater Treatment Plant, Moneypark, Fethard Co. Tipperary

Major upgrade of the Fethard Wastewater Treatment Plant including new tanks, substation, and flood prevention works.

2360207 · Tipperary County Council · Lodged 28 March 2023

Reference
2360207
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
28 March 2023

Summary

AI-generated

The project involves upgrading the existing wastewater treatment plant with new pumps, screening works, aeration and stormwater tanks, a chemical dosing system, and a new ESB substation. It also includes widening the vehicular entrance and creating a floodwater compensatory storage area.

Infrastructureinfrastructureutilityflooding

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The upgrade of the existing wastewater treatment plant, comprising of the replacement of the existing inlet pumps with new larger pumps; the decommissioning of the existing inlet works; the construction of a new inlet screening works area with greater capacity than existing inlet screening works, anoxic and aeriation tanks, a clarifier, a stormwater storage tank, a new chemical dosing system consisting of 2 no. Above-ground storage tanks and associated equipment, a kiosk to house control equipment and a flow splitting chamber (all above ground); the construction of a new esb mv substation and customer switch room building; and ancillary development including the widening of the existing vehicular entrance to the facility from the access road, the provision of new internal concrete roadway, footpaths and hardstanding areas, associated underground chambers, cabling and piping, internal site lighting, fencing, site landscaping and all associated site development works. The associated development works will include the creation of an approx. 1,250m2 floodwater compensatory storage area and the raising of approximately 2,740m2 of lands for flood prevention purposes at the wwtp extension site. A natura impact statement has been prepared in respect of this planning application

Key dates

Timeline

  1. Application received28 March 2023
  2. Decision due22 May 2023
  3. Decision issued18 May 2023
  4. Grant issued21 June 2023
  5. Permission expiry20 June 2028

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.