Planning Permission Ireland
GrantedEnergyDecided 17 November 2023

Ballynilard, Tipperary, Co. Tipperary

Alterations to a permitted solar farm in Tipperary, including a new substation and extending the operational lifespan to 40 years.

2360765 · Tipperary County Council · Lodged 25 September 2023

Reference
2360765
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
25 September 2023

Summary

AI-generated

The application seeks to modify a previously permitted solar farm by replacing a terminal electrical station and switchroom with a single-storey 20kV substation. It also requests to increase the operational period of the solar farm from 25 years to 40 years.

Energysolarsubstationinfrastructure
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Alterations to the previously permitted solar farm as follows: a) replacement of a permitted single storey terminal electrical station and a separate single storey electrical switchroom (permitted as part of a solar farm permission by tipperary county council reg. Ref. 16600359) with a single storey 20kv substation building on the site of the previously permitted terminal electrical station; repositioning of a permitted storage container, and minor solar panel layout revision adjacent to the proposed substation; repositioning of entrance gate and security fencing at entrance to the solar farm field; and provision of new gate in perimeter security fence adjacent to ballynilard stream; and b) permission to increase the operational period of the solar farm from 25 years to 40 years

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 16 December 2024.

Notified floor area: 40.94

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 September 2023
  2. Decision due19 November 2023
  3. Decision issued17 November 2023
  4. Grant issued21 December 2023
  5. Permission expiry20 December 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.