Planning Permission Ireland
Awaiting decisionInfrastructure

Shannon Sailing Marina, Dromineer Nenagh, County Tipperary

Expansion of the Shannon Sailing Marina in Dromineer to add 10 new boat berths.

2360983 · Tipperary County Council · Lodged 12 December 2023

Reference
2360983
Authority
Tipperary County Council
Register status
Withdrawn
Type
PERMISSION
Received
12 December 2023

Summary

AI-generated

The development includes widening the outer basin, installing a new pontoon walkway with six finger walkways, and widening the existing concrete slipway. Temporary cofferdams and barriers will be used to drain the basin during construction.

Infrastructuremarinaboatinginfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A) the provision of additional berthing facilities for 10 boats in the outer basin and associated works, b) the removal of existing earthen berm and widening of the marina outer basin on its western side, c) a new gabion retaining wall c. 10.5m long, composed of steam washed selected stone, to southern edge of widened marina basin, d) the installation of new 2m wide pontoon walkway, supported off steel piles, and six number 1m wide pontoon finger walkways and timber fendering to west side of the widened marina outer basin, e) the increase in width of existing concrete slipway located at south-east edge of outer basin from 4.75 metres to 6.5 metres, f) the installation of temporary water filled cofferdam to mouth of outer basin to enable short term drainage of the basin and which temporary cofferdam will be removed on completion of works to the outer basin, g) the installation of temporary panel barrier to channel between outer and inner basin to enable short term drainage of the outer basin and which temporary barrier will be removed on completion of works to the outer basin, h) the removal of spoil from the outer basin and from the channel connection to inner basin, i) all enabling and site development works, landscaping, paving, boundary treatment, plant areas, services provision and connections, waste management facilities and all other ancillary works. A natura impact statement will be submitted to the planning authority with the application

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
The Bungalow, Dromineer, NenaghApr 2026€275,000179 m
Killteelagh, Dromineer, NenaghFeb 2025€500,000262 m
Kilteelagh House, Dromineer, NenaghMar 2026€2,750,000328 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 December 2023
  2. Further information requested13 February 2024
  3. Further information received31 July 2024
  4. Application withdrawn12 November 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.