Horsepasture, Clonmel, Co. Tipperary
Amendments to an approved energy storage facility in Clonmel, including extending its lifetime to 10 years.
2360997 · Tipperary County Council · Lodged 15 December 2023
- Reference
- 2360997
- Authority
- Tipperary County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 15 December 2023
Summary
AI-generatedThe application seeks to amend a previously approved energy storage facility. Proposed changes include relocating the spare parts container, relocating drainage, and extending the project's operational lifetime from 5 to 10 years.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
A development that will consist of amending the existing consented granted application (planning reference: 18601037 and abp reference: 303718-19) at this site. The amendment application will consist of permission to amend the design of the approved development (planning reference: 18601037 and abp reference: 303718-19) which comprises consent for an energy storage facility to provide services to the national grid system on a site comprising of 24 battery containers, combined power conversion system (pcs) and transformer units, associated electrical infrastructure, fencing, access track, cctv, landscaping, and associated ancillary development. The proposed amendments include; (1) re-location of the spare parts container; (2) re-location of drainage and; (3) project lifetime proposed to be extended from 5 to 10 years. A natura impact statement (nis) was submitted with the consented application (planning reference: 18601037 and abp reference: 303718-19)
Land-use zoning
What this land is zoned for
“To provide for agricultural needs and to protect and enhance the rural environment and setting of the settlement”
National zoning type: Mixed/general primary sector uses, including 'rural'
Objective set by the Clonmel and Environs Local Area Plan 2024-2030 (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planKey dates
Timeline
- Application received15 December 2023
- Decision due17 February 2024
- Decision issued16 February 2024
- Grant issued21 March 2024
- Permission expiry20 March 2029
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
A 5 year permission for the construction of an Energy Storage Facility comprising battery containers and…
Horsepasture , Clonmel , Co. Tipperary
18601037TipperaryLodged 23 Aug 2018Energy
- Awaiting decision30 m away
Development of a 5 year permission for the construction of An Energy Storage Facility comprising battery…
Horsepasture , Clonmel , Co Tipperary
18600996TipperaryLodged 9 Aug 2018Energy
- Awaiting decision40 m away
Amending the existing consented granted application (Planning Reference: 18601037 and ABP Reference:…
Townland of Horsepasture , Clonmel , Co. Tipperary
2360773TipperaryLodged 28 Sept 2023Other
- Granted220 m away
The demolition of existing two storey extesion and develop a new two storey extension to the rear of the…
Horsepasture , Powerstown , Clonmel Co. Tipperary
2260438TipperaryLodged 25 Aug 2022Extension
- Awaiting decision230 m away
The demolition of existing two storey extension and develop a new two storey extension to rear of existing…
Horsepasture , Clonmel , Co. Tipperary
22471TipperaryLodged 15 Jul 2022Extension
- Awaiting decision310 m away
Development will consist of Permission to amend the design of the substation of the approved development…
Horsepasture/Doon , Clonmel , Co. Tipperary
21934TipperaryLodged 25 Jun 2021Energy
- Awaiting decision340 m away
To amend the design of the substation of the approved development (Planning Reference 16601136) which…
Horsepasture/Doon , Clonmel , Co. Tipperary
21993TipperaryLodged 9 Jul 2021Energy
- Granted400 m away
To amend the design of the substation of the approved development (Planning Reference 16601136) which…
Horsepasture/Doon , Clonmel , Co. Tipperary
211051TipperaryLodged 21 Jul 2021Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedEnergy
Development which will consist of amending the existing granted application (Planning Reference 18/6215) at…
Townland of Slanemore , Mullingar , Co. Westmeath
2360306WestmeathLodged 17 Sept 2023
- Awaiting decisionEnergy
To amend the design of the approved development (Planning Ref:lb171475) which comprises of consent for an…
Lands at Causetown , Stackallen , Co Meath
LB201174MeathLodged 28 Aug 2020
- GrantedEnergy
Permission for (i) Construction of a Stationary Battery Storage Facility which includes eight 40ft containers…
Xerox Technology Park , Dundalk , Co Louth
21900LouthLodged 19 Jul 2021
- GrantedEnergy
For development consisting of: A 10 year permission for the construction of an energy storage system…
Aghaway (Larah North ED) , Co. Cavan
20268CavanLodged 3 Jul 2020
- GrantedEnergy
Development consisting of the installation of battery arrays, located within container units (16 number…
Corderry (E.D. Belhavel) , Co. Leitrim
2020LeitrimLodged 12 Feb 2020
- GrantedEnergy
For ten-year planning permission for an energy storage facility comprising (i) energy storage containers…
Shankill Lower , Clonervy ED , Co. Cavan
2360236CavanLodged 25 Oct 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.