Planning Permission Ireland
GrantedHousing estateDecided 19 April 2024

Hughes Lot East, Cashel, Co. Tipperary

Construction of 101 homes, a creche, and a new roundabout in Cashel.

2361010 · Tipperary County Council · Lodged 20 December 2023

Reference
2361010
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
20 December 2023
Residential units
81
Floor area
7998 m²

Summary

AI-generated

This large-scale residential development consists of 101 homes, including 12 maisonettes, 62 houses, and 20 apartments in a three-storey building. The plans also feature a 240 square metre creche, a new roundabout, and a link road.

Housing estatelrdcrecheapartmentshousing estate
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • A large scale residential development (lrd), the site is bounded at the south by the r691 dualla road, crottys lane to the north, undeveloped residential zoned lands to the west and private residences to the east boundary - the development will consist of the erection of 101 dwellings, a childcare facility, construction of a new roundabout and link road and ancillary works on a gross site area of 3.96ha. The proposed development will be accessed from the new roundabout on the r691 dualla road and is more specifically described as follows
  • 12 no. One- bedroom maisonettes in two-storey semi-detached blocks
  • 49 no. Three-bedroom two storey semi-detached houses
  • 2 no. Three-bedroom two storey terraced houses
  • 1 no four-bedroom two storey semi-detached house
  • 11 no four-bedroom two storey detached houses
  • 6no. Two-bedroom two-storey terraced houses
  • 9 no one-bedroom apartments and 11 no 2 bedroom apartments in a 3 storey building
  • A childcare facility (creche) gross floor space 240m2 , refuse stores and secure bicycle store all located within the ground floor of the apartment building
  • 201 car parking spaces, (164 residential, and 37 for visitors and creche) , creche set down area, secure outdoor creche play area, 20 secure cycle spaces and 20 visitor cycle spaces (bicycle stand)
  • The proposed development will include new entrances leading onto the r691 dualla road to the south of the application site and l54151 crotty’s lane to the north, construction of a new link road between dualla road to the south of the application site and crotty’s lane to the north and alterations to the r691 dualla road to include new roundabout, new raised tables and pedestrian crossings
  • Private, communal and public landscaped amenity spaces, internal estate road network, pedestrian pavement network including new internal pedestrian pavements extending to the north and south boundaries of the proposal, inter-site boundary walls and fences, new site boundary walls and fences, undergrounding of existing overhead electricity supply cables traversing the development site, erection of a new esb sub station, public lighting, public drainage and water services connections and associated site development works

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
16 Lana Croke, Dun Chormaic, Dualla RdMay 2026€324,000177 m
Dualla Rd, Cashel, TipperaryNov 2025€560,000216 m
10 St Johns Close, The Steeples, CashelJan 2025€135,422223 m
Teach Garbh, Dualla Rd, CashelDec 2025€655,000240 m
16 Bishops Ave, The Steeples, CashelJun 2025€255,000249 m
14 The Steeple, Dualla Road, CashelJan 2026€270,000257 m
18 Carraig Downes, Dualla Rd, CashelDec 2025€282,000334 m
2 Radharc Deas, Dun Chormaic Dualla Road, CashelJun 2026€300,000377 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 December 2023
  2. Further information requested22 February 2024
  3. Further information received15 March 2024
  4. Decision due21 April 2024
  5. Decision issued19 April 2024
  6. Appeal submitted16 May 2024
  7. Appeal decided18 September 2024
  8. Permission expiry17 September 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.