Planning Permission Ireland
GrantedIndustrialDecided 23 April 2025

Killoran, Thurles, Co. Tipperary

Construction of a healthcare waste treatment and recycling facility with three buildings and associated infrastructure in Killoran.

2460978 · Tipperary County Council · Lodged 14 November 2024

Reference
2460978
Authority
Tipperary County Council
Register status
Decided
Type
PERMISSION
Received
14 November 2024

Summary

AI-generated

The development will consist of a state-of-the-art healthcare waste treatment and recycling facility and a waste transfer station. It includes three buildings, rooftop solar panels, a battery energy storage system, rainwater harvesting, and wastewater treatment systems. The facility is designed to process 10,000 tonnes of healthcare waste and 15,000 tonnes of hazardous waste annually.

Industrialwastesolarrecyclingbattery
Floor area
2,539 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A state-of-the-art healthcare waste treatment and recycling facility and a waste transfer station. The development will include the construction of 3 no. Buildings; building 1 (total gross floor area of circa (ca. ) 2,242m2 and ca. 9m tall), building 2 (total gross floor area of ca. 229m2 and ca. 6m tall) and building 3 (total gross floor area of ca. 68m2 and ca. 4m tall) along with associated ancillary development including rooftop solar photovoltaic panels, 1no. Battery energy storage system (total gross floor area of ca. 34m2 x 2m tall) and inverter, onsite tank with bunding, vehicle parking, rainwater harvesting tank, surface water retention ponds, firewater retention pond, firewater storage pillow tank, an on-site wastewater treatment system and associated polishing filter bed percolation area, dedicated container storage yard for the temporary storage of container units, signage, landscaping, perimeter security fencing and all ancillary works. The total development area will be ca. 3.75 hectares(ha). The development will intake ca. 10,000 tonnes per annum of healthcare waste for treatment and recycling and an additional ca. 15,000 tonnes per annum of hazardous waste will be accepted, temporarily stored, handled and consolidated onsite for onward transfer - an eiar has been submitted with the application

Key dates

Timeline

  1. Application received14 November 2024
  2. Further information requested17 January 2025
  3. Further information received27 February 2025
  4. Decision due23 April 2025
  5. Decision issued23 April 2025
  6. Grant issued27 May 2025
  7. Permission expiry26 May 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.