Newport College, Black Road, Newport
Installation of four heat pumps on the roof of Newport College.
25107 · Tipperary County Council · Lodged 13 June 2025
- Reference
- 25107
- Authority
- Tipperary County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 13 June 2025
Summary
AI-generatedThe development consists of the installation of four heat pumps on the flat roof to the north side of the existing school building.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The instillation of 4no. Heat pumps on the flat roof to the north side of the school
Land-use zoning
What this land is zoned for
“To provide and improve social and public facilities”
National zoning type: Mixed/general community services/facilities uses
Objective set by the Tipperary County Development Plan 2022_2028 Settlement Plans (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 83a Rosehill, Newport, Tipperary | Jun 2026 | €350,000 | 121 m |
| 56 Rosehill, Newport, Co Tipperary | Jan 2025 | €242,000 | 133 m |
| 28 Rosehill, Newport, Co. Tipperary | Oct 2025 | €335,000 | 149 m |
| 33 Rosehill, Newport, Tipperary | Jun 2025 | €240,000 | 182 m |
| 24 Rosehill, Newport, Co Tipperary | Nov 2025 | €315,000 | 188 m |
| 16 Rosehill, Newport, Tipperary | May 2026 | €315,000 | 200 m |
| 1 Glendarrig, Newport, County Tipperary | Jun 2026 | €360,000 | 214 m |
| 1 �rd Mheallain, Newport, Co. Tipperary | Nov 2025 | €205,000 | 220 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received13 June 2025
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
A new temporary single story detached accommodation unit for use as 6 no temporary classrooms and associated…
Black Road , Newport
18600877TipperaryLodged 9 Jul 2018Infrastructure
- Awaiting decisionAt this site
Construction of a 1, 2 & 3 Storey extension with a total floor area of 3,508m² comprising: 13 no. classrooms,…
Newport College , Black Road Newport , Co. Tipperary
2560356TipperaryLodged 24 Apr 2025Infrastructure
- Awaiting decisionAt this site
The construction of a 1, 2 & 3 Storey extension with a total floor area of 3,508m² comprising: 13 no.…
Newport College , Black Road Newport , Co. Tipperary
2560375TipperaryLodged 1 May 2025Infrastructure
- Granted40 m away
The conversion of a portion of the existing ball alley building for use as a canteen & gym, installation of a…
Newport College Black Road , Newport , Co. Tipperary
2561077TipperaryLodged 24 Oct 2025Alterations
- Granted40 m away
The construction of a 1, 2 & 3 storey extension with a total floor area of 3,508m² comprising: 13 no.…
Newport College Black Road , Newport , Co. Tipperary
2560385TipperaryLodged 7 May 2025Infrastructure
- Granted50 m away
Changes to Phase 2 of works (previously approved under Planning Ref 18600877) comprising the following:…
Newport College , Black Road , Newport
20724TipperaryLodged 8 Jul 2020Alterations
- Granted130 m away
A two storey extension to the rear of the existing dwelling and all associated site works
99 Rosehill , Newport , Co Tipperary
2260616TipperaryLodged 14 Nov 2022Extension
- Granted220 m away
The demolition of existing rear single storey extension and outbuildings. The construction of a single storey…
1 Ard Mheallain , Black Road , Newport Co.Tipperary
2660017TipperaryLodged 12 Jan 2026Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionInfrastructure
Install three heat pumps located to the north of the site. The works are proposed to decarbonise the schools…
Clonaslee College , Bellair or Cappanapinion , Clonaslee
2660158LaoisLodged 24 Mar 2026
- GrantedAlterations
The (a) Extension of Existing Plant room internally serving existing school, (b) Installation of external…
Ashbourne Avenue , South Circular Road , Limerick
23134LimerickLodged 6 Mar 2023
- GrantedAlterations
The development will consist of — The installation of an external heat pump, to the rear of the proposed new…
Scoil Naisunta Cnoc an Ein (Knockanean National School) , Knockanean , Ennis Co Clare V95 FW42
23300ClareLodged 24 May 2023
- GrantedAlterations
The erection of a pitched roof over the existing flat roof of the toilet block on the northern side of the…
Tuogh , Adare , Co. Limerick.
18488LimerickLodged 18 May 2018
- GrantedAlterations
Modifications to the permission granted under application register reference 21/424 which approved the…
St. Marks Special School , Station Road Piercetown , Newbridge Co. Kildare.
22570KildareLodged 17 May 2022
- GrantedAlterations
Construction of new pitched roof to be placed over the existing flat roof at the eastern block of the main…
Scoil Eoin Boys N.S., Station Rd, Ballincollig,
076678corkLodged 30 Mar 2007
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.