Within the townland of, Ballyboe, County Tipperary
A 32.6-hectare solar farm development and substation in County Tipperary.
2660072 · Tipperary County Council · Lodged 29 January 2026
- Reference
- 2660072
- Authority
- Tipperary County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 29 January 2026
Summary
AI-generatedPermission is sought for a 10-year period to construct a solar PV energy development on a 32.6-hectare site. The project includes solar panels, an ESB 38kV substation building, a control building, and represents an extension to an adjacent permitted solar farm.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
A red iii development for a period of 10 years for the construction of a solar pv energy development (renewable energy development) with a total site area of 32.6 hectares. The development will consist of pv panels mounted on metal frames, inverter station, string inverters, new access tracks, underground cabling, perimeter fencing with cctv cameras and access gates, electrical cabling and ducting, new on-site esb 38kv substation building, 33kv control building, lighting masts, laydown areas, landscaping and all ancillary grid infrastructure and associated works. The grid route is c. 1.06km in length. The application site will be accessed from two new access points off the r706, one of which was previously consented under planning reference: 19600239. The proposed development will connect with and represents an extension to the adjacent solar farm permitted under planning reference 19600239 and 21403. Permission is also sought for minor amendments to planning reference 19600239 and 21403 which comprises of (1) minor adjustments to the perimeter fencing (length decreasing by c. 1km), (2) minor adjustments to the red line boundary (decreasing by c. 1km), (3) increase operational lifetime from 30 years to 40 years. The proposed solar farm will connect to the national grid via the new 38kv substation and will have an operational lifetime of 40 years. A natura impact statement (nis) has been prepared in respect of this application. This development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413) and it is important to note that the planning application may be subject to section 34d of the planning and development act 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply
Key dates
Timeline
- Application received29 January 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted220 m away
Amend the design of the approved development (Planning Ref: 19/600239) which comprises consent for the…
Ballyboe , Clonmel , Co. Tipperary
21403TipperaryLodged 29 Mar 2021Energy
- Granted220 m away
A 10 year permission. The development will consist of a solar farm with an export capacity of 12 MW…
Ballyboe , Clonmel , Co. Tipperary
19600239TipperaryLodged 15 Mar 2019Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionEnergy
RED III application for the development, consisting of the construction of a solar photovoltaic (PV) energy…
land within the townlands of Lisheennamalausa Ballyryan West Gortdrum and Barnanalleen , in the Civil Parish of Solloghod-More , Co. Tipperary
2660157TipperaryLodged 24 Feb 2026
- Awaiting decision
RED III application — The development will consist of planning permission for a period of 10 years to…
Within the townlands of , Raheenbeg Ballychristal Killarles and Bawnmore , County Offaly.
2660319OffalyLodged 18 Jun 2026
- Awaiting decisionEnergy
RED III - the development will consist of a 10-year permission for the construction of a solar PV energy…
Curraghtown Veldonstown Kentstown and Flemingstown , Navan , Co. Meath
2561357MeathLodged 12 Dec 2025
- Awaiting decisionEnergy
RED III application for a solar photovoltaic (PV) farm and all associated works. This application involves…
Stonestown Kilcamin Crancreagh Derrinlough , Co. Offaly , Ireland
2660064OffalyLodged 10 Feb 2026
- Awaiting decisionEnergy
(RED III) a solar photovoltaic (PV) farm and all associated works. This application involves the installation…
townlands of Stonestown Kilcamin Crancreagh Derrinlough , Co. Offaly , Ireland
2660237OffalyLodged 1 May 2026
- GrantedEnergy
RED III application for a 10 Year Planning Permission for a solar farm with a total area of circa 11…
in the townland of Shanmullagh , Ballinamuck , Co Longford
2660061LongfordLodged 24 Feb 2026
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.