Awaiting decisionEnergy

Within the townland of, Ballyboe, County Tipperary

A 32.6-hectare solar farm development and substation in County Tipperary.

2660072 · Tipperary County Council · Lodged 29 January 2026

Reference
2660072
Authority
Tipperary County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
29 January 2026

Summary

AI-generated

Permission is sought for a 10-year period to construct a solar PV energy development on a 32.6-hectare site. The project includes solar panels, an ESB 38kV substation building, a control building, and represents an extension to an adjacent permitted solar farm.

Energysolarrenewablesubstation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A red iii development for a period of 10 years for the construction of a solar pv energy development (renewable energy development) with a total site area of 32.6 hectares. The development will consist of pv panels mounted on metal frames, inverter station, string inverters, new access tracks, underground cabling, perimeter fencing with cctv cameras and access gates, electrical cabling and ducting, new on-site esb 38kv substation building, 33kv control building, lighting masts, laydown areas, landscaping and all ancillary grid infrastructure and associated works. The grid route is c. 1.06km in length. The application site will be accessed from two new access points off the r706, one of which was previously consented under planning reference: 19600239. The proposed development will connect with and represents an extension to the adjacent solar farm permitted under planning reference 19600239 and 21403. Permission is also sought for minor amendments to planning reference 19600239 and 21403 which comprises of (1) minor adjustments to the perimeter fencing (length decreasing by c. 1km), (2) minor adjustments to the red line boundary (decreasing by c. 1km), (3) increase operational lifetime from 30 years to 40 years. The proposed solar farm will connect to the national grid via the new 38kv substation and will have an operational lifetime of 40 years. A natura impact statement (nis) has been prepared in respect of this application. This development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413) and it is important to note that the planning application may be subject to section 34d of the planning and development act 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply

Key dates

Timeline

  1. Application received29 January 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.