Planning Permission Ireland

Mayo planning

On this page

Live planning intelligence

Planning pulse

Updated 10 Aug 2026
New · 90 days

0

received — mostly still in process

weekly volume · last 12 wks

Recent decisions

0% granted

241 granted · 12 refused

Most common

permission

245 applications

Mayo planning authorities received 290 new planning applications over the last 90 days, with permission and retention being the most common application types. A total of 253 decisions were made during this period, resulting in a 95% grant rate with 241 applications approved and 12 refused.

Notable recent applications

  • A housing development consisting of 28 homes in terrace configurations, including single-storey, two-storey, and three-storey units, is proposed for Castlebar.

    permissionMount Gordon , Knockaphunta , Castlebar Co. Mayo· 2026-07-14Official application
  • The proposal seeks to demolish existing rear annex structures and construct a new rear extension alongside internal and external modifications to an existing dwelling in Belmullet.

    permission14 Shore Road , Belmullet , Mayo· 2026-07-24Official application
  • A residential development of 24 houses with mixed bedroom counts is proposed for Kilkelly, including a new vehicular entrance, parking, and an ESB substation.

    permissionRiver View Road , Kilkelly , Co. Mayo· 2026-07-23Official application
  • Retention permission is sought for a detached agricultural machinery diagnostics and training building, a dry storage shed, and associated site works in Bohola.

    retentionRathruane , Bohola , Co Mayo· 2026-07-13Official application
  • The applicant is seeking permission to demolish an existing shed and construct a single-storey extension to the side and rear of an existing dwelling in Shrule.

    permissionHundred Acres , Shrule , Co. Mayo· 2026-07-14Official application

Auto-generated from live planning data. Figures are indicative and for information only — not legal advice. Always confirm details on the official planning register.

House design guide

What this council wants your home to look like

Roof pitches, materials, and forms this council will accept — read from the development plan.

Prior to investing time, energy and money into your development it is essential that you undertake comprehensive research to ensure that you maximise the possibility of your planning application being successful. There are currently 31 Planning Authorities within the Republic of Ireland. Although the planning permission application and regulatory process is uniform throughout, individual Planning Authorities have varying objectives and visions of future developments within their local areas. Whether your development is residential, agricultural, commercial or industrial, the probability of your application being successful will be greatly enhanced if it is in keeping with the objectives of the County Mayo Planning Authority.

Planning Permission Ireland has every resource necessary to enable you to navigate your path through County Mayo’s planning process. From within our site, you can access guidelines, advice and detailed information specific to your proposed development and location. All frequently requested planning permission guidelines and information can be accessed via our Home Page drop-down menus. E.g. Planning Permission Ireland “Getting Started”, “Application Process”, ”Self Build” “Local Needs”, “Plans & Drawings” etc. In addition, you may utilise Planning Permission Ireland’s AI assisted Chatbot for more specific information with regard to County “Mayo Development Plan”, County “Mayo Local Area Plans”, “Building Regulations”, “National Planning Framework”, “Regional Spatial & Economic Strategies” etc.

To ensure that proposed planning and developments are in keeping with the economic, social and community needs of specific areas Planning Authorities adhere to a planning hierarchy as set out within Project Ireland 2040 and detailed below:

• National Planning Framework

• Regional Spatial & Economic Strategy

• County Mayo Development Plan

• County Mayo Local Area Plans

Mayo’s Planning Authority in deciding on a proposed planning application will be mindful of the overriding objectives of both the National Planning Framework as set out by the Department of Housing Local Government & Heritage and the Regional Spatial & Economic Strategy as set out by Regional Authorities. The Planning Authority will then ensure that your application is in keeping with both the Mayo Development Plan in addition to the Local Area Plan specific to the town or village where you propose to construct your development. If your proposed development is located within a rural area of Mayo your application will most likely be subjected to a Local Needs Assessment by the Mayo Planning Authority.

For example, a planning application to development a 100 unit 5 storey apartment block would have a greater likelihood of being successful in Castlebar than on the outskirts of Tooreen Village. Likewise a Planning Application to develop a one off residential bungalow would be more in keeping with the local area planning objectives of Bahola than that of Ballina Town.

Having carried out research into your proposed development you may find that planning permission is not required as Mayo Planning Authority may consider your project to be an Exempted Development. Considerable planning permission exemptions are afforded to agricultural developments in addition to small-scale residential extensions, alterations and renovations.

Prior to commencement (see Commencement Notices for more details) of any works regardless of size, scale or nature of your proposed development it is prudent to seek clarity from Mayo Planning Authority with regard to planning permission requirements. Construction, alteration or renovation of lands or structures which require planning permission that has not been applied for and granted may be deemed to be an Unauthorised Development by the Mayo Planning Authority and could lead to avoidable protracted and costly Enforcement Proceedings.

In order to avoid the pitfalls of lodging a Planning Application that is unsuitable or not in keeping with the Mayo Development Plan or your specific location’s Local Area Plan it is essential that you determine that your proposed development is compatible with the Planning Authority’s objectives. If you feel that your proposed development may not be fully in keeping with Mayo’s Development Plan or Local Area Plan objectives it would be wise to schedule a Pre Planning Consultation / Meeting with your local authority. We encourage you to maximise the comprehensive resources which Planning Permission Ireland provides, as we assist you on your journey.

Mayo Development Plan

Download your local planning authority’s development plan here.

Volume 1

• Written Statement

Volume 2

• Development Management Standards

Volume 3

• Book of Maps

• Housing Strategy

• Landscape Appraisal

• Renewable Energy Strategy

• Settlement Capacity

• Rural Housing Design Guidlelines

• Protected Structures

• Municipal District Projects

Environmental Reports

• Strategic Flood Risk Assessment

• Appropriate Assessment Statement

• SEA Environmental Report

• SEA Environmental Statement