Planning Permission Ireland
GrantedExtensionDecided 6 July 2018

Verona House, Pembroke Road, Carlow Town

Demolition, alterations, and extensions to a protected structure in Carlow Town.

18190 · Carlow County Council · Lodged 14 May 2018

Reference
18190
Authority
Carlow County Council
Register status
Decided
Type
PERMISSION
Received
14 May 2018
Residential units
1
Floor area
78.13 m²

Summary

AI-generated

The project involves the demolition of several rear structures and the construction of a new two-storey extension and single-storey extensions to the rear of Verona House. It also includes internal alterations and replacing front windows with timber sliding sash windows.

Extensionprotected structureextensiondemolition
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A protected structure. The development will consist of a) the demolition of an original single storey structure with pitched roof to rear of existing property, demolition of non-original single storey lean-to structure to the right and rear of existing property, demolition of non-original glazed structure to left and rear of existing property, deconstruction of original shed to rear and reuse of brick; b) alterations to ground floor and first floor layout of existing structure including forming new structural openings and removal of partitions; c). Construction of new two storey extension to rear of property, construction of single storey extension to right and rear of existing structure, construction of new glazed structure to left and rear of existing; d) removal of aluminium framed windows to front facade to be replaced with timber framed sliding sash windows; e) all associated ancillary landscaping and site works.

Land-use zoning

What this land is zoned for

Town CentreUC
To protect, provide for and/or improve town centre facilities and uses

National zoning type: City/Town/village Centre, central area

Objective set by the Carlow - Graiguecullen Joint Urban Local Area Plan 2024 - 2030 (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 2, Millbrook, Mill LaneDec 2025€207,00091 m
1 Barrowville Court, Pembroke, CarlowNov 2025€270,000103 m
13 Millbrook, Mill Lane, CarlowJan 2025€207,000120 m
Flynn'S Yard, Mill Lane, CarlowApr 2026€430,000130 m
8 Castle Hill, Carlownot full market priceMay 2026€137,000140 m
19 Millbrook, Mill Lane, CarlowSept 2025€187,500141 m
27 Castle Gate, Graigcullen, CarlowOct 2025€180,000141 m
2 Johnstreet, CarlowApr 2025€310,000151 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received14 May 2018
  2. Decision due8 July 2018
  3. Decision issued6 July 2018
  4. Grant issued8 August 2018
  5. Permission expiry7 August 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.