Construction of a large-scale solar PV development and battery storage facility on a 91.2-hectare site in County Carlow.
2360290 · Carlow County Council · Lodged 11 December 2023
- Reference
- 2360290
- Authority
- Carlow County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 11 December 2023
Summary
AI-generatedThis 10-year permission application is for a solar PV development across 91.2 hectares, including a 38kV substation, 352 battery energy storage units, and 15 transformer units. The project has a 40-year operational lifetime and will supersede a previously approved smaller solar development.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
10-year permission. The development will consist of the construction of (i) a solar pv development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 91.2ha, (ii) the construction of a 38kv substation building ((6.1m (h) x 20.9 (l) and 7.3 (w)) and associated compound area, a transformer unit (ca. 6m x ca. 3.6m) and associated bund, (iii) 352 number battery energy storage system units comprising 22 modules (ca. 21.9m x ca. 5.2m) each with 16 number cabinet units within each module and (iv) all ancillary development including 15 number transformer integrated units (ca. 10.5m x ca. 2.7m), 12 number inverter units (ca. 6.0m x ca. 2.4m), 7 number cctv cameras mounted on 4m high poles, a 3m high acoustic barrier, with berm and fencing, perimeter security fencing, site access, site egress and all ancillary works and services. The development will have a 40-year operational lifetime. Permission currently exists for a pv development on ca/65.6ha of the site (planning permission ref no. 21/23) that will be superseded by this application if approved
Key dates
Timeline
- Application received11 December 2023
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
10-year permission. The development will consist of the construction of (i) a Solar PV development comprising…
Grangeford Old and Friarstown , Co. Carlow , R93 PX51
2360297CarlowLodged 14 Dec 2023Energy
- Refused130 m away
10 Year permission for development consisting of the construction of a Solar PV development comprising…
Grangeford Old , and Friarstown , Co. Carlow
2123CarlowLodged 29 Jan 2021Energy
- Awaiting decision350 m away
The construction of a Pig Finishing Unit, Two Meal Bins, Two Water Tanks, Roof Mounted Solar Panels and all…
Grangeford , Tullow , Co. Carlow
18206CarlowLodged 22 May 2018Agricultural
- Awaiting decision350 m away
Construction of a Pig Finishing Unit, two meal bins, two water tanks, roof mounted solar panels and all…
Grangeford , Tullow , Co. Carlow
18164CarlowLodged 30 Apr 2018Agricultural
- Awaiting decision430 m away
Change of use of an existing shed from an agricultural store, to include the storage of treated biosolids for…
Grangeford , Co. Carlow
23168CarlowLodged 4 Oct 2023Change of use
- Granted490 m away
Permission for development of a solar PV Panel Array consisting of up to 48,800 m2 of solar panels on ground…
Friarstown , Tullow , Co Carlow
16325CarlowLodged 7 Nov 2016Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
10-year permission. The development will consist of the construction of (i) a Solar PV development comprising…
Grangeford Old and Friarstown , Co. Carlow , R93 PX51
2360297CarlowLodged 14 Dec 2023
- RefusedEnergy
10 Year permission for development consisting of the construction of a Solar PV development comprising…
Grangeford Old , and Friarstown , Co. Carlow
2123CarlowLodged 29 Jan 2021
- Awaiting decisionEnergy
A 10 year permission for the erection and operation of a solar photovoltaic energy development. The proposed…
Coolcarrigan , Timahoe West , Co. Kildare
221132KildareLodged 16 Sept 2022
- GrantedEnergy
10 year permission for the construction of a Solar PV Energy development within a total site area of up to…
Ballinclea Ballyrichard & Templerainey , Arklow , Co. Wicklow
171440WicklowLodged 5 Dec 2017
- Awaiting decisionEnergy
A10 year permission for development consisting of the construction of a Solar PV development comprising…
Kyleagarry Ballyryan East and Gortdrum , Co. Tipperary
2270TipperaryLodged 28 Jan 2022
- Awaiting decisionEnergy
A 10 year permission for development consisting of the construction of a Solar PV development comprising…
Kyleagarry Ballyryan East and Gortdrum , Co. Tipperary
2296TipperaryLodged 8 Feb 2022
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.