Planning Permission Ireland
GrantedAlterationsDecided 29 May 2024

Tintean Killyshane, Palatine, Co. Carlow

Refurbishment of a protected cottage, demolition of an extension, and construction of a new rear extension in Palatine.

2416 · Carlow County Council · Lodged 8 April 2024

Reference
2416
Authority
Carlow County Council
Register status
Decided
Type
PERMISSION
Received
8 April 2024
Residential units
1
Floor area
86 m²

Summary

AI-generated

The project involves refurbishing an existing cottage which is a protected structure, including removing the first floor and plaster. It also includes demolishing an existing single-storey extension and constructing a new single-storey rear extension containing a bathroom, bedroom, kitchen, and utility room.

Alterationsprotected structureextensiondemolition

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Refurbish existing cottage protected structure (rps no. : cw349) work will consist of removal of existing first floor bedroom / study / store and staircase, removal of all external and internal plaster re-point existing stone, make good to existing window opening on the ground floor gable end insert new granite reveals to match existing and replace concrete window cill with new granite window cill to match existing and all associated works
  • Demolish existing single storey kitchen/dining/living room extension
  • Construct new single storey bathroom, bedroom, kitchen/dining/living room, utility extension to the rear of existing cottage and all associated works

Land-use zoning

What this land is zoned for

Village CoreUC
To protect, provide for and/or improve town and village centre facilities and uses

National zoning type: City/Town/village Centre, central area

Objective set by the Carlow County Development Plan 2022 - 2028 Palatine Larger Serviced Village (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 6 June 2025.

Notified floor area: 126

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Palatine, CarlowApr 2025€213,500207 m
The Cottage, Palatine, CarlowJan 2026€460,000256 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 April 2024
  2. Decision due2 June 2024
  3. Decision issued29 May 2024
  4. Grant issued1 July 2024
  5. Permission expiry30 June 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.