Planning Permission Ireland
Awaiting decisionInfrastructure

Great Island to Kellis 220kV OHL circuit between Great Island Substation in the townland of Great Island Co. Wexford and Kellis Substation in the townland of Kellistown East Co. Carlow. Refer to Public Notices for full list of townlands.

Upgrades to a 70.3km overhead power line circuit between Wexford and Carlow.

2460319 · Carlow County Council · Lodged 7 October 2024

Reference
2460319
Authority
Carlow County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
7 October 2024

Summary

AI-generated

Permission is sought for extensive upgrade works along a 70.3km 220kV overhead line circuit. The works in County Carlow include restringing wires, strengthening foundations and towers, and replacing earthwires.

Infrastructuregridinfrastructureelectricity

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • For development consisting of works along the ca. 70.3km great island – kellis 220kv ohl between the existing great island 220kv substation in the townland of great island in southwest county wexford and the kellis 220kv substation located in the townland of kellistown east, central county carlow. The ohl has a total of 216no. Supporting structures. Within the functional area of carlow county council, there is 44.2km of the existing ohl circuit, with 135no. Structures. Within the functional area of wexford county council there is 26.1km, with 81no. Structures. A separate planning application is being lodged with wexford county council. The proposed development within co. Carlow will comprise
  • The replacement (“restringing”) of the existing overhead line circuit conductor wires with a new higher capacity conductor
  • The strengthening of foundations at 7no. Locations
  • Shear block remedial works at 77no. Locations
  • The strengthening of towers (i. E. , member replacement) at 34no. Locations
  • The replacement of 5.1km of earthwire
  • The painting of all structures
  • The replacement of insulating and ancillary hardware at structures
  • All associated works within the existing kellis 220kv substation to accommodate the uprated 220kv ohl including uprating of the great island bay in the kellis 220kv substation
  • The installation of a temporary link between the great island – kellis and dunstown – kellis 220kv ohls to create a temporary circuit, which will include the erection of a temporary four-pole timber structure between the existing angle mast 191 on the great island – kellis circuit and the existing angle mast 157 on the dunstown – kellis circuit
  • All associated temporary site development works to gain access to the existing structures including vegetation clearance and management, disassembly and reassembly of gate posts / piers and removal and reinstatement of existing fencing; and
  • Other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, vegetation clearance and management, stone tracks, ground protection mats, infrastructure crossing support systems (i. E. , guard poles) and temporary watercourse crossings. Where required, an aerial catenary stringing system (acss) will be used to facilitate stringing operations over major obstacles, e. G. , busy national roads, wide rivers, etc

Key dates

Timeline

  1. Application received7 October 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.