GrantedEnergyDecided 31 October 2025

In the townlands of Ballybannon Ballybar Lower Ballybar Upper Ballycarney, Ballyloo Cloghna Linkardstown and Park, in County Carlow.

A 10-year permission for a 57-hectare solar farm with associated infrastructure across multiple townlands.

2560137 · Carlow County Council · Lodged 22 May 2025

Reference
2560137
Authority
Carlow County Council
Register status
Decided
Type
PERMISSION
Received
22 May 2025

Summary

AI-generated

A 10-year planning permission is sought for a solar farm spanning approximately 57 hectares. The project includes ground-mounted solar panels, inverter stations, underground cabling crossing under the M9 motorway and Dublin-Waterford railway, and associated infrastructure for a 40-year operational lifespan.

Energysolarrenewableinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A 10 year planning permission for a solar farm with a total area of circa 57 hectares. The solar farm will consist of solar panels on ground mounted frames, 8 no. Single storey electrical inverter/transformer stations, 2 no. Single storey spare parts containers, 1 no. Ring main unit, 3 no. Weather stations, underground electrical ducting and cabling within the development site, private lands and within the l4038, l8185, r448, l3051, l3052 and l3050 public roads to connect solar farm field parcels, security fencing, cctv, access tracks, 5 no. Watercourse/drain deck crossings and 2 no. Horizontal directional drill crossings (under m9 motorway and the dublin - waterford railway), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. Existing entrances from the r448 and l1010. Sections of the proposed underground electrical cabling will traverse the solar farms proposed under carlow county council references 24/60043 and 24/60205, but will not alter infrastructure proposed under these applications. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A natura impact statement (nis) has been prepared and will be submitted to the planning authority with the application.

Key dates

Timeline

  1. Application received22 May 2025
  2. Further information requested16 July 2025
  3. Further information received8 September 2025
  4. Decision due2 November 2025
  5. Decision issued31 October 2025
  6. Grant issued3 December 2025
  7. Permission expiry2 December 2035

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.