Planning Permission Ireland
Awaiting decisionAlterationsDecision due in 6 days (29 July 2026)

Fruit Street, Hacketstown, Co. Carlow

Renovation and alterations to an existing house in Hacketstown, including roof replacement and partial demolition.

2660173 · Carlow County Council · Lodged 4 June 2026

Reference
2660173
Authority
Carlow County Council
Register status
In progress
Type
PERMISSION
Received
4 June 2026

Summary

AI-generated

The project involves replacing the roof and first floor, lowering the ground floor, and replacing front windows and doors. It also includes the demolition of rear store walls, constructing a raised patio, and building a single-storey connection to an existing store.

Alterationsrenovationpatiodemolition

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Changes and renovation to existing dwelling. Permission sought for replacement of roof and first floor, lowering of the ground floor by 300mm approximately, changing the front door which fronts to fruit street to a glazed opening, replacement of front windows. Provision of side gate entrance at existing stone wall boundary at side access road. Demolition of single storey walls which were part of rear store to the dwelling. Construction of raised patio area outside the rear wall of the dwelling to link with the proposed side access, this will have steps to the rear yard. Provision of double door and window openings, at the rear ground floor, provision of rooflights at the rear roof , construction of single storey connection between the dwelling and the store which is an existing open area under a galvanized corrugated steel roof which is part of the existing two storey, store roof. Construction of steps to the raised access area outside the utility, and all associated site works

Land-use zoning

What this land is zoned for

Town CentreUC
To protect, provide for and/or improve town and village centre facilities and uses

National zoning type: City/Town/village Centre, central area

Objective set by the Carlow County Development Plan 2022 - 2028 Hacketstown Small Town Plan (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Barrack Lane, Hacketstown, CarlowAug 2025€191,00062 m
Main St, Kiltegan, Co WicklowNov 2025€180,000105 m
Hackettstown, Co Carlownot full market priceOct 2025€67,500148 m
Fair Green, Hacketstown, County CarlowNov 2025€215,000205 m
3 Mountain View, Hacketstown, CarlowSept 2025€222,000229 m
Hacketstown Christian Centre, The Green, HacketstownDec 2025€230,000491 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 June 2026
  2. Decision due29 July 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.