Corgarry Cabra Cormey and Mullantra, Kingscourt, Co. Cavan

A 10-year planning permission for upgrading the Kingscourt Wastewater Treatment Plant and laying a new outfall pipeline.

2660289 · Cavan County Council · Lodged 27 May 2026

Reference
2660289
Authority
Cavan County Council
Register status
In progress
Type
PERMISSION
Received
27 May 2026

Summary

AI-generated

The proposal seeks a 10-year permission to upgrade the Kingscourt Wastewater Treatment Plant, including the demolition of existing inlet works and decommissioning of the storm water tank. It also involves constructing a new underground storm water holding tank, an outfall pumping station, and a 3km primary discharge outfall pipe to the River Lagan.

Infrastructureinfrastructurewastewaterutilityupgrade

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For a 10-year planning permission for works to upgrade the kingscourt wastewater treatment plant (wwtp) in the townland of corgarry, and construction of an outfall pipeline in the public road corridor and in private lands in the townlands of corgarry, cabra, cormey and mullantra, all in the electoral division of kingscourt in county cavan. The proposed development consists of the following works: (1) demolition of existing inlet works and replacement with new inlet works including a dual function overflow chamber, flume, screens, and grit and grease removal units; (2) decommissioning of the existing storm water tank and the storm water overflow (swo) outfall at the wwtp; (3) new dual function overflow outfall pipe connection from the new wwtp inlet works to the single outfall to the cabra stream (glyde_010); (4) 1 no. New underground storm water holding tank and associated swo outfall pipe connection via a single outfall to the cabra stream (glyde_010), adjacent to the wwtp; (5) 1 no. New underground drainage attenuation tank; (6) outfall pumping station and new primary discharge outfall pipe from the wwtp (ca. 3km) to the river lagan (glyde_020); (7) chemical storage tanks and dosing equipment for alkalinity boosting phosphorus removal and sludge treatment; (8) 1 no. Sludge dewatering building, 1 no. Welfare building and 1 no. Of motor control centre (mcc) kiosk; (9) an odour control unit consists of high-density polyethylene carbon filter units and associated above ground ductwork; (10) a new electricity supply board substation; (11) demolition of the existing tanks and structures not used in the future design, i. E. , inlet works, primary settling tank, trickling filters, rotating biological contactor, hummus/settlement tank, storm tanks, sludge mixing tank, sludge holding tank, return pump sump, admin building, and reed beds area; (12) extension of internal access road and provision of a turning head; (13) demolition of the existing access bridge over the watercourse at the north boundary, and construction of a new access road and bridge; (14) open tank process units, including below and above ground pump and drainage chambers, effluent pumping station with a surge vessel, biological reactors, clarifiers, and sludge treatment units; (15) ancillary works: a) access platforms; b) provision of a back-up generator with a built-in diesel tank to be used in an emergency/power cut; c) provision of paved/peb

Key dates

Timeline

  1. Application received27 May 2026
  2. Decision due21 July 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.