Planning Permission Ireland
GrantedEnergyDecided 23 March 2022

Building 2, East Park Smithstown, Shannon Co Clare

Installation of a 13MW rooftop solar system, battery storage, and a backup generator in Shannon.

2265 · Clare County Council · Lodged 1 February 2022

Reference
2265
Authority
Clare County Council
Register status
Decided
Type
PERMISSION
Received
1 February 2022

Summary

AI-generated

The development at the Zimmer Biomet premises consists of installing a 13MW solar photovoltaic system on the roofs. It also includes a battery energy storage system with two inverters and two 1.04MWh batteries, a backup generator, two transformers, and associated site works.

Energysolarbattery storageindustrialgreen energy

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For development at the existing facility at building 2, east park, smithstown, shannon, co clare. The development will consist of: installation of a 13mw solar photovoltaic system on the roofs of the zimmer biomet premises, along with the associated fixing and mounting systems. Installation of a battery energy storage system to comprise of 2 no. Inverters and 2 no. 1.04mwh batteries. Installation of a back-up generator. Installation of 2 no. Transformers. All ancillary development including the construction of supporting concrete plinths, perimeter palisade fencing, electrical cabling, on-site drainage and the relocation of an existing storage unit

Land-use zoning

What this land is zoned for

Light IndustrySI
The use of land for light industry shall be taken to incl. uses where the primary activity is the manufacture of a physical product. The use for ind./manufacturing, incubator units, distribution, open storage, transport operating centres etc is accept.

National zoning type: Industrial, enterprise, employment

Objective set by the Shannon Town and Environs Local Area PLan (2012–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received1 February 2022
  2. Decision due28 March 2022
  3. Decision issued23 March 2022
  4. Grant issued26 April 2022
  5. Permission expiry25 April 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.