Planning Permission Ireland
GrantedIndustrialDecided 27 September 2022

Smithstown Industrial Estate, Smithstown, Shannon

Demolition of a storage building and construction of a new 1,774 sqm storage and logistics building in Shannon.

22710 · Clare County Council · Lodged 8 August 2022

Reference
22710
Authority
Clare County Council
Register status
Decided
Type
PERMISSION
Received
8 August 2022

Summary

AI-generated

The development consists of the demolition of an existing 266 sqm storage, logistics, and loading building. It will be replaced by a new 1,774 sqm storage, logistics, and loading building ancillary to the existing industrial facility.

Industrialdemolitionindustriallogistics
Floor area
1,774 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For development , the development will consist of the demolition of existing storage, logistics and loading building (266m2) and construction of new storage, logistics and loading building (1,774m2) ancillary to existing industrial building and connection to public utilities together with ancillary site development works

Land-use zoning

What this land is zoned for

Light IndustrySI
The use of land for light industry shall be taken to incl. uses where the primary activity is the manufacture of a physical product. The use for ind./manufacturing, incubator units, distribution, open storage, transport operating centres etc is accept.

National zoning type: Industrial, enterprise, employment

Objective set by the Shannon Town and Environs Local Area PLan (2012–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
61 Radharc An Doire, Smithstown, Shannonprice excludes VATDec 2025€286,600316 m
62 Radharc An Doire, Smithstown, Shannonprice excludes VATDec 2025€306,600316 m
59 Radharc An Doire, Smithstown, Shannonprice excludes VATDec 2025€306,600316 m
58 Radharc An Doire, Smithstown, Shannonprice excludes VATDec 2025€321,600316 m
60 Radharc An Doire, Smithstown, Shannonprice excludes VATDec 2025€286,600316 m
48 Radharc Doire, Smithstown, Shannonprice excludes VATJan 2025€374,449443 m
47 Radharc Doire, Smithstown, Shannonprice excludes VATMar 2025€370,044453 m
78 radharc doire, smithstown, shannonprice excludes VATJun 2026€315,859457 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 August 2022
  2. Decision due2 October 2022
  3. Decision issued27 September 2022
  4. Grant issued3 November 2022
  5. Permission expiry2 November 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.