Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More, Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen, (Ed Cloghers) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed
Development of an 8-turbine wind farm and underground grid connection across multiple townlands in County Clare.
2317 · Clare County Council · Lodged 13 January 2023
- Reference
- 2317
- Authority
- Clare County Council
- Register status
- Invalid or incomplete
- Type
- PERMISSION
- Received
- 13 January 2023
Summary
AI-generatedThis application seeks permission for an 8-turbine wind farm with blade tip heights up to 176.5m. The project includes an underground grid connection to the national grid, a 100m meteorological mast, and an onsite 38kV electrical substation.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
For development of a wind farm in the townlands of fahy beg, fahy more north, ballymoloney, ballyknavin (ed o'briensbridge), balllyquin more, woodpark and leitrim, co clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of leitrim, fahy more south, ballybrack, aharinaghmore, tooreen (ed cloghera) aharinaghbeg, knockdonagh, roo east, blackwater, rosmadda west, parkroe, lackyle (ed ballyglass) and castlebank, co clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of ardataggle, co clare. The development will consist of: construction of 8 no. Wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; erection of 1 no. Permanent meteorological mast to a height of 100m above ground level; construction of 1 no. Onsite 38kv electrical substation to esb networks (esbn) specifications and associated compound including welfare facilities, electrical infrastructure, parking, wastewater holding tank, rainwater harvesting tank, security fencing and all associated infrastructure, services and site works including landscaping in the townland of woodpark; installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; construction of turbine foundations and crane pad hardstanding area; construction of new site tracks and associated drainage infrastructure; upgrading of existing tracks and associated drainage infrastructure where necessary; access to the proposed wind farm site will be from the r466 local road and will consist of the use of an existing quarry entrance in the townland of leitrim which will be upgraded, as well as the creation of 1 no. New permanent site entrance on the fahymore local road in the townland of ballyquin more, and the use of 1 no. Existing field entrance which will be upgraded, in the townland of ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; all associated drainage and sediment control; installation of new watercourse and drain crossings; reuse and upgrading of existing internal watercourse and drain crossings; 2 no. Temporary construction site compounds and
Key dates
Timeline
- Application received13 January 2023
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedEnergy
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed…
Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More , Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen , (Ed Cloghera) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed
23148ClareLodged 9 Mar 2023
- Awaiting decisionEnergy
A ten-year planning permission for development at a site in the townlands of Kilbane, Killeagy (Ryan),…
Kilbane Killeagy (Ryan) Shannaknock Killeagy (Stritch) , Killeagy (Goonan) Ballymoloney Magherareagh and Lackareagh Beg , Co. Clare.
2460394ClareLodged 21 Aug 2024
- GrantedEnergy
Nineteen (19) number wind turbines (blade tip height up to 169 metres), Nineteen (19) number wind turbine…
Ballydonaghan Caherhurley Coumnagun , Carrownagowan Inchalughoge , Killokennedy Kilbane
229000ClareLodged 30 Nov 2020
- RefusedEnergy
For the development of a windfarm in the townlands of Cahermurphy, Knocknahila More South, Carrownagry South,…
Cahermurphy Knokcnahila More South , Carrownagry South Caheraghacullin , Drummin Doolough Glenmore & Booltiagh Co Clare
20658ClareLodged 18 Sept 2020
- Awaiting decisionEnergy
Permission for the construction, operation and decommissioning of a wind energy development including — 9…
Polnareagha, Ardskeagh, Tullacondra, Croughta, Kilmaclenine, Ballyclogh, Knockaunavaddreen,, Copestown, Ballybeg, Baltydaniel East, Twopothouse, Caurraghakerry, Co. Cork
245215corkLodged 28 Jun 2024
- GrantedEnergy
The Applicant is seeking permission for the construction, operation and decommissioning of a wind energy…
Polnareagha, Ardskeagh, Tullacondra, Croughta Kilmaclenine, Ballyclogh, Knockaunavaddreen, Copestown, Ballybeg, Baltydaniel East Twopothouse, Caurraghakerry, Co. Cork
24/5503corkLodged 9 Aug 2024
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.