Awaiting decisionEnergy

Fahy Beg Fahy More North Ballymoloney Ballyknavin (Ed O'Briensbridge) Ballyquin More, Woodpark Leitrim Fahy More South Ballybrack Aharinaghmore Tooreen, (Ed Cloghers) Aharinaghbeg Knockdonagh Roo East Blackwater Rosmadda West Parkroe Lackyle (Ed

Development of an 8-turbine wind farm and underground grid connection across multiple townlands in County Clare.

2317 · Clare County Council · Lodged 13 January 2023

Reference
2317
Authority
Clare County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
13 January 2023

Summary

AI-generated

This application seeks permission for an 8-turbine wind farm with blade tip heights up to 176.5m. The project includes an underground grid connection to the national grid, a 100m meteorological mast, and an onsite 38kV electrical substation.

Energywind farmenergyinfrastructuresubstation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For development of a wind farm in the townlands of fahy beg, fahy more north, ballymoloney, ballyknavin (ed o'briensbridge), balllyquin more, woodpark and leitrim, co clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of leitrim, fahy more south, ballybrack, aharinaghmore, tooreen (ed cloghera) aharinaghbeg, knockdonagh, roo east, blackwater, rosmadda west, parkroe, lackyle (ed ballyglass) and castlebank, co clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of ardataggle, co clare. The development will consist of: construction of 8 no. Wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; erection of 1 no. Permanent meteorological mast to a height of 100m above ground level; construction of 1 no. Onsite 38kv electrical substation to esb networks (esbn) specifications and associated compound including welfare facilities, electrical infrastructure, parking, wastewater holding tank, rainwater harvesting tank, security fencing and all associated infrastructure, services and site works including landscaping in the townland of woodpark; installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; construction of turbine foundations and crane pad hardstanding area; construction of new site tracks and associated drainage infrastructure; upgrading of existing tracks and associated drainage infrastructure where necessary; access to the proposed wind farm site will be from the r466 local road and will consist of the use of an existing quarry entrance in the townland of leitrim which will be upgraded, as well as the creation of 1 no. New permanent site entrance on the fahymore local road in the townland of ballyquin more, and the use of 1 no. Existing field entrance which will be upgraded, in the townland of ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; all associated drainage and sediment control; installation of new watercourse and drain crossings; reuse and upgrading of existing internal watercourse and drain crossings; 2 no. Temporary construction site compounds and

Key dates

Timeline

  1. Application received13 January 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.