Planning Permission Ireland
GrantedExtensionDecided 22 January 2024

Mountievers, Sixmilebridge, Co Clare

Construction of a five-bedroom extension to a hostel and retention of an existing shed.

23582 · Clare County Council · Lodged 20 November 2023

Reference
23582
Authority
Clare County Council
Register status
Decided
Type
PERMISSION
Received
20 November 2023

Summary

AI-generated

The development consists of a single-storey flat-roof extension to the rear of the existing hostel, comprising five single ensuite bedrooms. The application also seeks retention permission for an existing detached single-storey shed with a dual-pitched roof.

Extensionhostelextensionretention
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For development, the development consists of a single storey flat roof extension, comprising of 5 no. Single ensuite bedrooms, with modifications on connecting the extension to the existing walls, windows and roof, to the rear elevations of single storey blocks of the existing hostel and retention of the existing detached single storey shed with dual pitched roof, with all associated site works

Land-use zoning

What this land is zoned for

Existing ResidentialRS
The obj. for land zoned ‘existing residential’ is to conserve & enhance the quality and character of the areas, to protect residential amenities and to allow for small scale infill development which is appropriate to the character and pattern of Dev

Objective set by the Sixmilebridge Settlement Plan (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 11 March 2024. A completion certificate was lodged on 16 January 2025.

Notified floor area: 70.3

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
6 Cluain Droichid, Sixmilebridge, ClareNov 2025€317,00094 m
5 Thomond Terrace, Sixmilebridge, ClareMay 2025€160,000112 m
2 Thomond Terrace, Sixmilebridge, ClareNov 2025€200,000129 m
47 Inis Orga, Sixmilebridge, ClareApr 2025€290,000204 m
44 Inis Orgg Sixmilebridge, Sixmilebridge, ClareDec 2025€311,000220 m
56 Cluain Droichid, Sixmilebridge, ClareFeb 2025€340,000282 m
8 George's Street, Sixmilebridgeprice excludes VATMar 2026€277,093331 m
7 Georges Street, Sixmilebridgeprice excludes VATNov 2025€281,938337 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 November 2023
  2. Decision due23 January 2024
  3. Decision issued22 January 2024
  4. Grant issued27 February 2024
  5. Permission expiry26 February 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.