Planning Permission Ireland
GrantedChange of useDecided 10 July 2023

The Old Rectory, Mountshannon, Co Clare

Conversion of a protected rectory building into a tourism interpretive centre and café.

238001 · Clare County Council · Lodged 5 May 2023

Reference
238001
Authority
Clare County Council
Register status
Decided
Type
PERMISSION
Received
5 May 2023

Summary

AI-generated

Permission is sought to convert and alter the Old Rectory, a protected structure, from residential use to a tourism interpretive centre and café. The works include demolishing a 157 sqm outbuilding, constructing a 57 sqm single-storey extension, installing a lift, and creating new internal and external openings.

Change of useprotected structuretourismcafedemolition
Floor area
57 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

To carry out the following development, alterations, modifications and change of use of the existing old rectory, mountshannon (a protected structure, rps 464) from residential to tourism interpretive centre and café uses, on a site measuring 1.35ha in the townland of mountshannon, consisting of: i. Demolition of the existing outbuilding (157sq. M) to the north-east of the site; ii. Construction of a 57 sq. M single-storey ground floor extension to the north-west of the building (double height space) with a maximum height of 6.4m (and lift height 7.8m) above ground level and new internal stair access; iii. At ground floor level, exhibition and educational spaces, together with supporting uses including a reception area, welfare facilities and plant room; iv. At first floor level, a café, ancillary retail and office spaces, together with welfare facilities and storage area; v. A new lift within the footprint of the existing building to provide for universal access to first floor level; vi. At ground floor level, a new opening in the northern and western wall of the existing building to provide access to the proposed extension, new and enlarged opening to internal walls between the existing kitchen and utility room, new openings between the existing hallway and lounge, and removal of the wall between the existing wc and office and between the existing kitchen and hallway; vii. At first floor level, new openings and removal of internal partitions, together with an opening in the roof to provide access to the lift and a new opening in the northern wall at first floor level to provide access to the café; viii. Cleaning and repointing works to the existing brickwork, repair and replacement of any damaged roof slates with natural slate, replacement of pvc windows with double-glazed timber sash windows and the removal of modern internal additions (flooring and cornices); ix. Resurfacing of the existing internal vehicular access road and construction of a new vehicle passing bay along the existing internal access road; x. Provision of 2 new dedicated pedestrian access points from harbour road including 1 at the existing site entrance and 1 to the south-west of the site, together with construction of a 1.8m wide pedestrian footpath to the west of the existing internal vehicular access road and a new public footpath to the south of the old rectory site with a new pedestrian crossing connecting to the existing path to the south of harbour road; xi provision of a new ped

Land-use zoning

What this land is zoned for

TourismTR
Land zoned for tourism development shall be used for a range of structures and activities which are primarily designed to facilitate tourism development

National zoning type: Tourism and related

Objective set by the Mountshannon Settlement Plan (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 14 November 2023. A completion certificate was lodged on 12 May 2025.

Notified floor area: 356

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Woodlands, Main Street, MountshannonApr 2025€155,000209 m
8 Sandycove, Mountshannon, ClareApr 2026€250,000232 m
2 Village Living, Mountshannon, ClareJun 2026€239,000275 m
7 Lakeside Close, Mountshannon, ClareMar 2026€240,000301 m
Whitegate Rd, Mountshannon, ClareNov 2025€300,000307 m
19 Lakeside View, Mountshannon, ClareNov 2025€245,000326 m
Main St, Mountshannon, ClareMar 2026€465,000384 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 May 2023
  2. Decision due9 August 2023
  3. Decision issued10 July 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.