Armada House and Hotel, Spanish Point, Co. Clare
Installation of two wastewater pumping stations and a 4.3km rising main pipe serving the Armada Hotel and Armada House.
2660146 · Clare County Council · Lodged 10 March 2026
- Reference
- 2660146
- Authority
- Clare County Council
- Register status
- In progress
- Type
- PERMISSION
- Received
- 10 March 2026
Summary
AI-generatedThe development consists of a primary wastewater pumping station at Armada House and a secondary pumping station at the Armada Hotel. It includes a 4.3km rising main pipe within public road carriageways. Works will take place within the curtilage of two protected structures, Armada House and Bealaclugga Bridge.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- For development of 1 no. Primary wastewater pumping station at the armada house and 1 no. Secondary wastewater pumping station at the armada hotel, spanish point county clare and for the development of a rising main wastewater pipe (c. 4.3kms in length) located within the public road carriageway (l6224, r482 and n67) in the townlands of leagard south, dough, annagh, caherrush, emlagh and quilty west, county clare. The proposed development includes works within the curtilage of a protected structure, armada house, formally mother mccauley house (rps no. 025) and works to the bealaclugga bridge which is a protected structure (rps no. 185). The proposed development will consist of the following
- Provision of 1 no. Primary wastewater pumping station at the armada house, to service the existing armada hotel and the existing armada house
- Provision of 1 no. Secondary wastewater pumping station at the armada hotel, including 2 no. Wastewater holding tanks
- Provision of a 110mm rising main pipe from the armada hotel to the armada house (c. 240m in length), within the public road crossing the r482 and l6224
- Provision of 1 no. 110mm rising main pipe located within the public road (l6224, r482 and n67) from the proposed primary wastewater pumping station at the armada house to the existing irish water foul sewer network at quilty, which conveys flows to the existing irish water kilmurry ibrickane wastewater treatment plant (asset number: d0536-02). The proposed rising main is c. 4.3km in length and located entirely within the public road corridor
- Decommissioning and removal of 1 no. Existing wastewater treatment plant, existing polishing filter, and existing percolation area at the armada hotel
- Decommissioning and removal of 1 no. Existing wastewater treatment system and percolation area at the armada house
- Provision of 1 no. Temporary construction compound at the armada house for the duration of the works
- All associated development and site enabling works and ancillary infrastructure including screening planting, scour valves, air valves,1 no. Vent pipe, and 1 no. Discharge manhole. A natura impact statement (nis) has been prepared in respect of the proposed development
Key dates
Timeline
- Application received10 March 2026
- Further information requested1 May 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted380 m away
To demolish existing shed and construct a dwelling house, garage, garden/office, deck area, install…
Caherrush , Quilty , Co Clare
24101ClareLodged 28 Mar 2024New dwelling
- Granted420 m away
To RETAIN side and rear extensions to dwellinghouse, plus detached outhouses
Caherrush , Quilty , Co. Clare
1620ClareLodged 18 Jan 2016Retention
- Granted430 m away
To construct a farm building used for the storage of machinery and hay, and not used for housing animals,…
Caherrush , Quilty , Co. Clare
26126ClareLodged 8 May 2026Agricultural
- Granted490 m away
Of the following works a) boundary walls and site entrances as constructed b) windows, fascia, soffit and…
Dough , Spanish Point , Co Clare
22633ClareLodged 13 Jul 2022Retention
- Granted500 m away
To construct a building for the purposes of using it as an Art Studio and to connect to existing site…
Dough , Spanish Point , Co. Clare
18220ClareLodged 22 Mar 2018Commercial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionInfrastructure
For development at this site at the Armada Hotel and Armada House (which is a protected structure, RPS No.…
Armada Hotel and Armada House , Spanish Point Miltown Malbay , Co. Clare
2560441ClareLodged 16 Jul 2025
- Awaiting decisionRetention
To RETAIN development at the Armada Hotel, Spanish Point, Miltown Malbay,Co. Clare. The development consists…
Spanish Point , Miltown Malbay , Co Clare
2360374ClareLodged 15 Sept 2023
- GrantedInfrastructure
For development at this site; Armada House, Spanish Point, Miltown Malbay, Co. Clare which is a protected…
Armada House , Leagard South , Spanish Point Co. Clare
2460305ClareLodged 2 Jul 2024
- GrantedRetention
And PERMISSION for development at Armada House, Spanish Point, Miltown Malbay, Co. Clare which is a protected…
Armada House , Spanish Point , Co. Clare
2460215ClareLodged 16 May 2024
- Awaiting decisionAlterations
For development at Spanish Point House, Spanish Point, Co. Clare which is a protected structure, the…
Spanish Point , Co. Clare
22873ClareLodged 28 Sept 2022
- GrantedExtension
(1) The completion of a 366.32 sqm first floor bedroom extension and roof to existing ground floor plan…
Woollen Mill , Derrybawn Laragh , Co. Wicklow
2460597WicklowLodged 30 Sept 2024
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.