Planning Permission Ireland
GrantedApartmentsDecided 29 August 2016

8 - 9 John Redmond Street, Cork

Conversion of a former dental hospital into apartments and the addition of a two-storey rooftop extension.

1636835 · Cork City Council · Lodged 13 April 2016

Reference
1636835
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
13 April 2016

Summary

AI-generated

Permission is sought to convert a former two-storey dental hospital into 7 apartments (6 one-bed and 1 two-bed). The project also includes building a two-storey extension on top of the existing building to house 4 additional apartments, along with elevation changes.

Apartmentsapartmentsconversionextension
Residential units
11
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for the change of use of existing two storey building, formerly dental hospital, to 6 no. 1 bed apartments and 1 no. 2 bed apartment. Also planning permission for the construction of a 2 storey extension on top of the existing building to contain 1 no. 2 bed maisonette apartment, 1 no. 3 bed maisonette apartment and 2 no. 3 bed apartments. Also, planning permission for elevation changes along john redmond street to include additional windows at first floor level, the revision of ground floor windows to a door and all ancillary site works

Land-use zoning

What this land is zoned for

City CentreUC
To consolidate and facilitate the development of the central area and to promote its role as a dynamic mixed used centre for community, economic, civic, cultural and residential growth.

National zoning type: City/Town/village Centre, central area

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 12 June 2017. A completion certificate was lodged on 16 September 2018.

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
6 Redmond House, John Redmond St, CorkOct 2025€200,00016 m
1 Redmond House, John Redmond St, CorkOct 2025€200,00016 m
4 Redmond House, John Redmond St, CorkOct 2025€200,00016 m
5 Redmond House, John Redmond St, CorkOct 2025€200,00016 m
2 Redmond House, John Redmond St, CorkOct 2025€200,00016 m
3 Redmond House, John Redmond St, CorkOct 2025€200,00016 m
22 C Lower John St, Cork, CorkOct 2025€200,00035 m
Apt 22d, 22 Lower John Street, CorkDec 2025€230,00035 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received13 April 2016
  2. Decision due29 August 2016
  3. Decision issued29 August 2016
  4. Grant issued23 January 2017
  5. Appeal submitted26 September 2016
  6. Appeal decided23 January 2017

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.