Planning Permission Ireland
GrantedChange of useDecided 12 October 2016

27-29 Washington Street, Cork City

Change of use of part of the ground floor from retail to a restaurant and bar at a protected structure on Washington Street.

1636972 · Cork City Council · Lodged 15 July 2016

Reference
1636972
Authority
Cork City Council
Register status
Decided
Type
PERMISSION
Received
15 July 2016

Summary

AI-generated

The development will convert part of the ground floor from retail to restaurant/bar use. It includes widening a side door, creating a new door on the south elevation, installing rear extract ducting, and adding signage. The works will be carried out on a protected structure.

Change of userestaurantbarheritage

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • A development at 27-29 washington street, cork city. The development will comprise of the following
  • The change of use of part of the ground floor from retail to restaurant/bar use
  • Increase the width of the existing side door to the east elevation
  • The removal of a window and the formation of a new door to the south elevation
  • The provision of extract ducting to the rear
  • Connections to all relevant services &
  • Provision of ancillary signage. The proposed works will be carried out to a protected structure ps 1096/1097

Land-use zoning

What this land is zoned for

City CentreUC
To consolidate and facilitate the development of the central area and to promote its role as a dynamic mixed used centre for community, economic, civic, cultural and residential growth.

National zoning type: City/Town/village Centre, central area

Objective set by the Cork City Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 2b, Hanover Street, CorkNov 2025€300,00044 m
Apt.1, 23 A - Washington Street, CorkApr 2025€525,00045 m
Apt.1, 23 A - Washington Street, CorkJul 2025€525,00045 m
20d, Wilton Manor, WiltonMay 2026€310,00063 m
Apartment 1, 14 South Main Street, CorkMay 2025€153,333107 m
Apartment 3, 14 South Main Street, CorkMay 2025€153,333117 m
Apartment 2, 14 South Main Street, CorkMay 2025€153,333117 m
Apt 1, 14 Washington St, Cork CityApr 2026€780,000118 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 July 2016
  2. Decision due13 October 2016
  3. Decision issued12 October 2016
  4. Grant issued14 November 2016

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.